Telecoms, Lanesboro 110 kV substation townlands of Aghamore and Lanesborough...

Longford · Longford County Council · Plan 2460287 · PB ref PB-10000312526

- Replacement (“restringing”) and uprating of the conductor on the existing Athlone-Lanesboro 110 kV overhead line circuit, measuring approximately 0.12km in length; - Provision of fibre communication connection on the uprated circuit; -Completion of foundation strengthening and bar member replacements to 1No. end mast within...

Indicative value Not listed PB indicative band
Units applied for Not listed public application record
Floor area Not listed no reliable figure indexed
Decision 22 Jan 2025 public planning date
Commenced None indexed public commencement index
Decision-stage scope

The public decision state is shown, but conditions and later amendments can still change delivery scope.

Application scope

Package signals below are limited to wording in the public application record.

Not procurement evidence

No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.

Opportunity & supplier intelligence

What is known, and what may happen next

Source-linked

Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.

Likely procurement timing Post-decision monitoring

A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.

Decision date 22 Jan 2025. / Confidence: Low
Decision CONDITIONAL

Decision date 22 Jan 2025.

Commencement activity No linked activity indexed

No commencement indexed / This is an index state, not proof that no works have started.

Source limited
Drawings availability Drawing availability not indexed

No drawing entry is available in this lead's bounded document evidence.

Source limited

Confirmed application scope

- Replacement (“restringing”) and uprating of the conductor on the existing Athlone-Lanesboro 110 kV overhead line circuit, measuring approximately 0.12km in length; - Provision of fibre communication connection on the uprated circuit; -Completion of foundation strengthening and bar member replacements to 1No. end mast within the existing Lanesboro 110 kV substation; and -All associated development, including providing an access track and temporary construction compounds, to facilitate the proposed development. A...

Ref 2460287 Source-linked Official application description for exact planning reference 2460287

Public source roles

No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.

Explicit source signals only

0 packages

No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.

Confidence & provenance 0 official sources
Authority
Longford County Council
Exact reference
2460287
Evidence reviewed
2 Jun 2026
Confidence
Source-linked

Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.

Application-stage scope

What the public record evidences

1 source-supported signals
Telecoms

Telecoms

The public application record identifies telecoms in the submitted planning scope.

2460287Explicit application record

Only source-supported scope signals are shown; generic trade padding is omitted.

Project facts

Named source parties

Promoter
not included in reference feed
Planning agent
not included in reference feed
Official description

Application text

- Replacement (“restringing”) and uprating of the conductor on the existing Athlone-Lanesboro 110 kV overhead line circuit, measuring approximately 0.12km in length; - Provision of fibre communication connection on the uprated circuit; -Completion of foundation strengthening and bar member replacements to 1No. end mast within the existing Lanesboro 110 kV substation; and -All associated development, including providing an access track and temporary construction compounds, to facilitate the proposed development. A Natura Impact Statement (NIS) has been prepared to accompany this planning application

Source-aware chronology

Application to site progress

Empty lanes explain their state.
AppealsAn Coimisiún Pleanála
  1. Appeal No appeal indexed No public appeal record is indexed against this application.
CommencementPublic commencement index
  1. Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
CompletionPublic completion projection
  1. Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Evidence register

Source, scope and limits

Public planning record
Application description and scale 2460287

- Replacement (“restringing”) and uprating of the conductor on the existing Athlone-Lanesboro 110 kV overhead line circuit, measuring approximately 0.12km in length; - Provision of fibre communication connection on the uprated circuit; -Completion of foundation strengthening and bar member replacements to 1No. end mast within the existing Lanesboro 110 kV substation; and -All associated development, including providing an access track and temporary construction compounds, to facilitate the proposed development. A Natura Impact Statement (NIS) has been prepared to accompany this planning application

AuthorityLongford County Council
Reference2460287
StatusChecked 2 Jun 2026
Open official record