Demolition, Rhine, Killoe, Co.Longford
end of waste activities within the footprint of the existing quarry, where some activities include; 1) Acceptance, processing and recovery of in-coming inert waste material arising from construction and demolition activity, comprising concrete, bricks, soil or other such similar material, to become a certified product for...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 17 Dec 2025. / Confidence: LowDecision date 17 Dec 2025.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
end of waste activities within the footprint of the existing quarry, where some activities include; 1) Acceptance, processing and recovery of in-coming inert waste material arising from construction and demolition activity, comprising concrete, bricks, soil or other such similar material, to become a certified product for reuse in construction related industries 2) The maximum annual intake of incoming waste material shall not exceed of 24,500 tonnes; 3) The processing will include standard crushing and screening...
Named firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Longford County Council
- Exact reference
- 2560252
- Evidence reviewed
- 2 Jun 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Demolition
The public application record identifies demolition in the submitted planning scope.
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- not included in reference feed
- Planning agent
- not included in reference feed
More Longford planning activity
These are county discovery links, not claimed relationships to this application.
Application text
end of waste activities within the footprint of the existing quarry, where some activities include; 1) Acceptance, processing and recovery of in-coming inert waste material arising from construction and demolition activity, comprising concrete, bricks, soil or other such similar material, to become a certified product for reuse in construction related industries 2) The maximum annual intake of incoming waste material shall not exceed of 24,500 tonnes; 3) The processing will include standard crushing and screening using the existing quarry plant; The site infrastructure for the proposed End of Waste activities will be limited to bays comprising storage and processing; 4) All ancillary site development works. The proposed development seeking planning permission will require a 'Waste Facility Permit' for the acceptance and processing of the in-coming waste, which will be sought through a separate application to Longford County Council. The proposed development seeking planning permission will require registration with Environmental Protection Agency for End of Waste recovery under the National End of-Waste Decision EoWN00l/2023 criteria
Application to site progress
-
Applied 3 Nov 2025 2560252
-
Decision Conditional 17 Dec 2025
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2560252
end of waste activities within the footprint of the existing quarry, where some activities include; 1) Acceptance, processing and recovery of in-coming inert waste material arising from construction and demolition activity, comprising concrete, bricks, soil or other such similar material, to become a certified product for reuse in construction related industries 2) The maximum annual intake of incoming waste material shall not exceed of 24,500 tonnes; 3) The processing will include standard crushing and screening using the existing quarry plant; The site infrastructure for the proposed End of Waste activities will be limited to bays comprising storage and processing; 4) All ancillary site development works. The proposed development seeking planning permission will require a 'Waste Facility Permit' for the acceptance and processing of the in-coming waste, which will be sought through a separate application to Longford County Council. The proposed development seeking planning permission will require registration with Environmental Protection Agency for End of Waste recovery under the National End of-Waste Decision EoWN00l/2023 criteria
Open official record