Site start · Co. Louth
Blackrock, Louth
Granted 22 Nov 2020 (final grant issued 23 Dec 2020)
Key facts
- Site start record 20696 at Blackrock, Co. Louth: SHD STAGE 3.
- The planning authority is Louth County Council.
- Status: Granted 22 Nov 2020 (final grant issued 23 Dec 2020).
Source: the Louth County Council planning register, as last seen on 10 Jun 2026. Open the council's file
More planning applications in Blackrock · Planning applications in Co. Louth
Council register
The council's register shows: Granted on 22 Nov 2020.
Search the Louth planning register
Application details as we last saw them in the national register on 10 Jun 2026.
What and where
SHD STAGE 3
SHD STAGE 3 - Application lodged with An Bord Pleanála (Stage 2 Ref. 20/69) for provision of a total of 257no. residential units along with provision of a crèche. Particulars of the development comprise as follows: (a) Site excavation works to facilitate the proposed development to include excavation and general site preparation works along with removal of existing site compound. (b) The provision of a total of 163no. residential dwellings which will consist of the following unit mix -57no. 2 bed dwellings (house types 1, 1a, 1b) -76no. 3bed semi detached dwellings (house types 2, 2a, 2b, 3, 6) -5no. 3 bed terrace dwellings (terrace block 3) -13no.4 bed semi detached dwellings (house type 6a) -12no. 4 bed detached dwellings (house types 4 & 5) (c) The provision of a total of 94no. apartments/duplex units consisting of 19no. 1 bed units, 38no. 2bed units and 37no. 3bed units; (d) Provision of a creche; (e) Provision of associated car parking at surface level via a combination of in-curtilage parking for dwellings and via on-street parking for the creche, duplexes and apartments; (f) Provision of 4no. electric vehicle charge points adjacent to the creche building with associated site infrastructure ducting to provide charge points for residents throughout the site; (g) Provision of associated bicycle storage spaces with associated enclosures both at surface level throughout the site and bicycle storage facilities within apartment blocks 1 & 2; (h) Use of existing access from Dublin Road with associated upgrade works to facilitate vehicular, pedestrian and cycle access to include provision of a right turning lane; (i) Provision of a cycle path along Dublin Road; (j) Provision of internal access roads and footpaths and associated connections to the existing Earlsfort residential estate; (k) Provision of residential communal open space areas (including formal play areas) including all hard and soft landscape works with public lighting, planting and boundary treatments to include boundary walls, railings & fencing; (l) Provision of 2no. ESB substations; (m) Internal site works and attenuation systems to include a hydrocarbon and silt interceptor on the storm network prior to discharge to the adjacent watercourse; (n) All ancillary site development/construction works to facilitate foul, water and service networks for connection to the existing foul, water, gas and ESB networks. Number of units reduced to 216 by An Bord Pleanála
- Location
- Blackrock, Co. Louth Map
- Council
- Louth County Council
- Planning reference
- 20696
- Application type
- Commencement Notice
- Owner named on the notice
- P.j. & E.j. Doherty Ltd
- Agent named on the notice
- P.j. & E.j. Doherty Ltd
Numbers and dates
- Project type
- Infrastructure
- Received
- 9 Sep 2020
- Decision to grant
- 22 Nov 2020
- Final grant
- 23 Dec 2020
- Site start notified
- 11 Nov 2021
Site history
This site's history
-
Earlier permission 2069 for this site: decision to grant 24 Mar 2020.
SHD Stage 2 Pre Application to ABP. ABP Opinion 24/03/2020 Named in this application's description
Earlier records are the planning references this application names, records at the same address, and records within 50 m of the same map point. An address or a map point can cover more than one property, so check the council's file before relying on a match.
Documents and evidence
Check the record
- Council planning fileThe application file 20696 on eplanning.ie: drawings, reports and the decision.Open the council's file
- From the planning documentsRead from Planning Report and Statement of Consistency in the council's file.
- Homes
- 257
- Site area
- 7.6 ha
- Applicant in the planning documents
- PJ & EJ Doherty Ltd
- Phasing
- Phases 4, 5 and 6 permitted under previous permission; proposed development includes creche and community facility.
- Scope
- The proposed development is for 257 residential units and a creche on brownfield lands at Earlsfort, Dundalk, under the Strategic Housing Development provisions.
How we know this
From the Louth County Council planning register, as last seen on 10 Jun 2026. The council's own file is the official record. Facts from the planning documents were read from the documents in that file.
Site starts
Site starts and completion
- 11 Nov 2021Notice filed · phase 1 · Dwelling No.s A43+A44, A45+A46, A47+A48, A55+A56, A57+A58, A83 + A84 and A85 + A86...View the site start
- 4 Jan 2022Notice filed · phase 2 · Construction of dwelling Units A49+A50, A51, A52+A53+A54, A59+A60+A61, A78+A79+80...View the site start
- 8 May 2023Notice filed · phase 3 · Dwelling No.s A62+A63, A64+A65, A66+A67, A68+A69, A70+A71 Adare Earlsfort Blackrock Co...View the site start
- 28 Nov 2023Notice filed · phase 4 · Construction of 14 No Dwelling Houses...View the site start
- 22 Feb 2024Notice filed · phase 5 · Construction of dwellings No. R1, R2+R3, R4+R5, R6+R7, R8 at Rossmore, Earlsfort...View the site start
- 13 Mar 2024Notice filed · phase 6 · Construction of dwelling Units R9+R10, R11+12, R13+R14, R15+R16, R17+R18, R19+R20...View the site start
- 21 Mar 2024Notice filed · phase 7 · Construction of dwelling Units R50+R51, R52+R53, R54+R55 and R56+R57 at Rossmore...View the site start
- 23 Sep 2024Notice filed · phase 8 · 11 No. Dwelling Units, 5 No. at Adare A6+A8, A10+A11+A12 and 6 No. at Rossmore R84 and...View the site start
- 23 Sep 2024Notice filed · phase 9 · Construction of 18 No. Dwelling Units C1-C18View the site start
- Full completion certificate recordedRecorded in Nov 2021 · 1 unit on this certificateThe month is when the certificate was published, not the date the work finished. It covers the work listed on the certificate; later phases can have their own. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
- Completion certificate recordedRecorded in Nov 2021 · 2 units on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
- Completion certificate recordedRecorded in Nov 2021 · 1 unit on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.
Explore the area