Planning application · Co. Louth

Richard Taaffes Holding, Father Finn Park/Green Road, Louth Village Dundalk

Granted on appeal 20 Sep 2023 (Decision to grant 30 Sep 2022 by the council)

We no longer update this application, so we can't email you about it. Get new planning applications in Co. Louth by email

Key facts

  • Planning application 22362 at Richard Taaffes Holding, Father Finn Park/Green Road, Louth Village Dundalk: 30 homes.
  • It was received by Louth County Council on 6 May 2022.
  • Status: Granted on appeal 20 Sep 2023 (Decision to grant 30 Sep 2022 by the council).

Source: the Louth County Council planning register, as last seen on 2 Jun 2026. Open the council's file

Planning applications in Co. Louth

Council register

The council's register shows: Decision to grant on 30 Sep 2022.

Application details as we last saw them in the national register on 2 Jun 2026.

What and where

30 homes

permission for the demolition of an existing derelict cottage, construction of 28 no. dwellings on a site of c.1.2785 hectares. All dwellings are provided with private amenity space in the form of private garden. The 28 no. dwellings consist of 2 no. semi-detached 3 bed two storey dwellings (house type LV1a); 2 no. semi-detached 3 bed two storey dwellings (house type LV1b); 2 no. detached 4 bed single storey dwellings (house type LV2a & LV2b); 1 no. detached 3 bed two storey dwellings (house type LV3a); 8 no. semi-detached 3 bed two storey dwellings (house type LV3b); 4 no. terraced 3 bed two storey dwellings (house type LV4); 4 no. terraced 3 bed two storey dwellings (house type LV5); 2 no. semi-detached 2 bed two storey dwellings (house type LV6); 1 no. detached 4 bed two storey dwelling (house type LV7a); 2 no. semi-detached 4 bed two storey dwellings (house type LV7b); vehicular and pedestrian access to the proposed development will be via Father Finn Park/Green Road. The development includes the provision of a new vehicular entrance and access road, EV charging points, public and communal play spaces with associated landscaping, new boundary treatments, all associated internal access roads, parking area, footpaths, foul and surface water drainage, watermains, site lighting, electricity sub-station, development naming feature, all associated/ancillary landscaping and site development works **Significant further information received on 12.9.22 which includes Revised site arrangement plans proposing the construction of 30 no. dwellings on the site of c. 1.2785 hectares, with revised road/footpath arrangements and public/private open space provisions. Revised Proposed Dwelling Details consisting of 3 no. semi-detached 3 bed two storey dwellings (house type LV1a); 3 no. semi-detached 3 bed two storey dwellings (house type LV1b); 2 no. detached 4 bed single storey dwellings (house type LV2a); 10 no. semi-detached 3 bed two storey dwellings (house type LV3a); 4 no. terraced 3 bed two storey dwellings (house type LV4); 6 no. terraced 3 bed two storey dwellings (house type LV5); 2 no. semi-detached 4 bed two storey dwellings (house type LV7b). Site specific Archaeological Assessment report. Road Safety Audit Stage 1 & 2 with auto track analysis**

Location
Louth Village Dundalk, Co. Louth Map
Planning reference
22362

Numbers and dates

Homes
30
Floor area
3,535 m²
Estimated construction value
€5.3m to €6.8mOur estimate from floor area and project type, at January 2026 prices, building works only. Not a stated figure. How we estimate
Received
6 May 2022
Council decision
30 Sep 2022
Appeal lodged
19 Oct 2022
Granted on appeal
20 Sep 2023
Site start notified
6 Nov 2023

Timeline

  1. Application received
  2. Decision to grant by the council
  3. Appeal lodged
  4. Appeal decidedGrant permission with revised conditions
  5. Site start notified

Outlook

What happens next

Work packages named so far

  • Roads and site development worksNamed in the application description
  • Services and drainageNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

How we know this

From the Louth County Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.

Site starts

Site starts and completion

  1. 6 Nov 2023Notice filed · phase 1 · The construction of 30 no. dwellings on the site of c. 1.2785 hectares, with revised...View the site start
  2. 5 Dec 2023Notice filed · phase 2 · Construction of 30 no. dwellings on the site of c. 1.2785 hectares, with revised...View the site start
  3. 5 Dec 2023Notice filed · phase 3 · Construction of 30 no. dwellings on the site of c. 1.2785 hectares, with revised...View the site start
  4. Completion certificate recordedRecorded in Nov 2023 · 5 units on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 20 Nov 2026.
  5. Completion certificate recordedRecorded in Nov 2023 · 2 units on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 20 Nov 2026.
  6. Completion certificate recordedRecorded in Dec 2023 · 8 units on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 20 Nov 2026.

A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.

Explore the area

More planning activity near Louth Village Dundalk

Get alerts for Co. LouthFree. We email you when new applications appear.

Free email alerts

Get new Louth projects by email

New applications, decisions and site starts in Co. Louth. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

More alert options