Large residential · Co. Louth
Raynoldstown Village, Haynestown Dublin Road Dundalk, Co. Louth
Granted 20 Sep 2023 (final grant issued 23 Oct 2023)
We no longer update this application, so we can't email you about it. Get new planning applications in Co. Louth by email
Key facts
- Planning application 2360257 at Raynoldstown Village, Haynestown Dublin Road Dundalk, Co. Louth: 96 homes.
- The applicant is Groveview Builders Ltd.
- It was received by Louth County Council on 31 Jul 2023.
- Status: Granted 20 Sep 2023 (final grant issued 23 Oct 2023).
Source: the Louth County Council planning register, as last seen on 2 Jun 2026. Open the council's file
Council register
The council's register shows: Granted on 20 Sep 2023.
Search the Louth planning register
Application details as we last saw them in the national register on 2 Jun 2026.
What and where
96 homes
Permission for development to consist of 96 houses comprising of: 6 no. mid-terraced 2 storey 2 bedroom dwellings (Type H), 11 no. end of terrace 2 storey 3 bedroom dwellings (Type K), 25 no. semi-detached 2 storey 3 bedroom dwellings (Type K), 6 no. semi-detached 2 storey 3 bedroom dwellings (Type K1), 41 no. semi-detached 2 storey 4 bedroom dwellings (Type M), 3 no. semi-detached 2 storey 4 bedroom dwellings (Type M1), 1 no. detached 2 storey 4 bedroom dwelling (Type M1), 1 no. detached 2 storey 4 bedroom dwelling (Type M2), 1 no. detached 2 storey 4 bedroom dwellings (Type S), 1 no. detached 2 storey 4 bedroom dwellings (Type S1) and all associated ancillary site development works, boundary treatments, landscaping and open spaces on lands of circa 7.18Ha. (Previous Permission 03/1754) with existing vehicular and pedestrian access from the Dublin Road via The Boulevard, Raynoldstown Village, Haynestown, Dublin Road, Dundalk, Co. Louth. This application is accompanied by a Natura Impact Statement (NIS)
- Location
- Haynestown Dublin Road Dundalk, Co. Louth Map
- Council
- Louth County Council
- Planning reference
- 2360257
- Applicant
- Groveview Builders Ltd
Numbers and dates
- Homes
- 96
- Floor area
- 11,242 m²
- Estimated construction value
- €17m to €22mOur estimate from floor area and project type, at January 2026 prices, building works only. Not a stated figure. How we estimate
- Project type
- Large residential
- Received
- 31 Jul 2023
- Decision to grant
- 20 Sep 2023
- Final grant
- 23 Oct 2023
- Site start notified
- 22 Apr 2024
Timeline
- Application received
- Decision to grant
- Final grant issued
- Site start notified
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file 2360257 on eplanning.ie: drawings, reports and the decision.Open the council's file
- From the planning documentsRead from Planning Report by Michael J. Cummings Planning Consultant in the council's file.
- Unit mix
- 4 4 bed/6 person detached, 47 4 bed/6 person semi-detached, 1 4 bed/6 person detached (Type M2), 1 4 bed/7 person detached (Type S), 1 4 bed/7 person detached (Type S1), 6 3 bed/5 person semi-detached, 36 3 bed/5 person semi-detached/end of terrace, 6 2 bed/4 person mid-terraced
- Site area
- 57 ha
- Applicant in the planning documents
- Groveview Builders Ltd
- Phasing
- The 96 houses are part of a larger project; previous phases built 604 dwellings, 102 under construction.
- Scope
- Proposed construction of 96 houses on a 57ha infill site with existing access from Dublin Road via The Boulevard, including all supporting infrastructure.
- Groundworks
- “Substantial pre-housing building works undertaken including new access carriageways, sanitary services, pumping station construction, archae”
- Rainwater
- “SuDs employed to control surface water flows.”
- Wastewater
- “Connections with public water and foul drainage systems.”
How we know this
From the Louth County Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record. Facts from the planning documents were read from the documents in that file.
Site starts
Site starts and completion
- 22 Apr 2024Notice filed · Construction of 96 new houses at Drayton, Raynoldstown Village, Haynestown, Dundalk, Co...View the site start
- Partial completion certificate recordedRecorded in Apr 2024 · 16 units on this certificateThe month is when the certificate was published, not the date the work finished. It covers part of the development, not the whole permission. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
- Partial completion certificate recordedRecorded in Apr 2024 · 8 units on this certificateThe month is when the certificate was published, not the date the work finished. It covers part of the development, not the whole permission. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
- Partial completion certificate recordedRecorded in Apr 2024 · 6 units on this certificateThe month is when the certificate was published, not the date the work finished. It covers part of the development, not the whole permission. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.
Explore the area