Development Description
Permission for proposed welfare facilities upgrades at Tallanstown Wastewater Treatment Plant (WWTP). The application is made under Section 34 of the Planning and Development Regulations 2000 (as amended). The proposed development will consist of: • 1 no. prefabricated steel container measuring 10ft (3.048m) in length x 10ft (3.048m) x 2.7m in height. The unit will be fitted out with welfare facilities including toilet and shower. • The unit will be installed on a reinforced concrete base complete with perimeter footpaths. • 2 no. 100mm ducts will be installed between the new unit and the existing structure to allow connection of water and electrical services. • 150mm wastewater connection from the new unit to a nearby manhole. • All associated ancillary site development works above and below ground
Map
No coordinates supplied in the public planning feed.