Telecoms · Co. Louth
Proposed development to consist of, And Tullyeskar, Co. Louth
Under appeal since 14 Jan 2026 (Granted 10 Dec 2025 by the council)
Key facts
- Planning application 2460766 at And Tullyeskar, Co. Louth: Proposed development to consist of.
- It was received by Louth County Council on 4 Dec 2024.
- Status: Under appeal since 14 Jan 2026 (Granted 10 Dec 2025 by the council).
- The council's decision was appealed to An Coimisiún Pleanála. The appeal decides the outcome, and building work cannot start before it.
Source: the Louth County Council planning register, checked 2 Jun 2026. Open the council's file
Since you last looked
Worked out in this browser from the record's own dates.
What and where
Proposed development to consist of
Permission for proposed development to consist of: (i) The construction of 5 no. wind turbines with the following parameters: a) Total tip height range of 179.5m – 180m, b) Rotor diameter range of 149m – 163m, c) Hub height range of 98m to 105m, (ii) Construction of turbine foundations, crane hardstand areas and assembly areas; (iii) All associated wind farm underground electrical and communications cabling connecting the turbines and meteorological mast to the proposed onsite electrical substation including cabling. in the public road corridor in the townlands of Gallstown and Kearneystown; (iv) Construction of 1 no. permanent 38kV electrical substation compound including a single-storey control building with welfare facilities, all associated electrical plant and equipment, security fencing, gates, all associated underground cabling, wastewater holding tank, and all ancillary structures and works in the townland of Piperstown. (v) A Battery Energy Storage System within the 38kV electrical substation compound; (vi) All works associated with the connection of the proposed wind farm to the national electricity grid which includes 5 no. of water crossings (3 no. bridges and 2 no. culverts). The provision of joint bays and associated communication chambers along the underground electrical cabling route via underground 38kV electrical cabling predominantly within the public road corridor, from the onsite substation in the townland of Piperstown to the existing Drybridge 110 kV Substation located in the townland of Tullyallen; (vii) Reinstatement of all road and track surfaces above cabling trench along existing roads and tracks in public lands; (viii) Provision of new site access tracks and upgrade of existing site tracks/roads to facilitate access to all onsite infrastructure this includes 3 no. water crossings, passing bays and all associated drainage; (ix) The provision of 2 no. new permanent site entrances for construction and operational access from the local road L6274 in the townlands of Kearneystown and Gallstown; (x) The permanent realignment of 1 no. existing entrance for construction and operational access to the 38kV electrical substation compound from the local road L2275 in the townland of Piperstown; (xi) Use of 1 no. existing site entrance for construction, operational access to the permanent met mast on a private road off local road L2275 in the townland of Drumshallon. (xii) The construction of 1 no. new temporary track in the townland o
- Location
- And Tullyeskar, Co. Louth Map
- Council
- Louth County Council
- Planning reference
- 2460766
Numbers and dates
- Project type
- Telecoms
- Received
- 4 Dec 2024
- Council decision
- 10 Dec 2025
- Appeal lodged
- 14 Jan 2026
Timeline
- Application received
- Granted by the council
- Appeal lodged
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file 2460766 on eplanning.ie: drawings, reports and the decision.Open the council's file
- AppealUnder appeal · 500624 / 14 Jan 2026View the appeal record
How we know this
From the Louth County Council planning register, checked 2 Jun 2026. We link to the council's own file so you can check the official record before you act.
Explore the area