Large residential · Co. Louth
Model Farm Road, Dromiskin, Co.Louth
Granted 28 Oct 2025 (final grant issued 28 Nov 2025)
Key facts
- Planning application 2560276 at Model Farm Road, Dromiskin, Co.Louth: ~33 homes.
- It was received by Louth County Council on 14 May 2025.
- Status: Granted 28 Oct 2025 (final grant issued 28 Nov 2025).
- Work was due to start on 13 Jul 2026, according to the commencement notice. It does not say which contractors or suppliers are appointed.
Source: the Louth County Council planning register, checked 2 Jun 2026. Open the council's file
More planning applications in Dromiskin · Planning applications in Co. Louth
What and where
~33 homes
The development will comprise a total 33no. residential units and associated works as follows:(a) The provision of a total of 33no. two storey residential dwellings which will consist of 11no. 3 bed units and 22no. 4 bed units; (b) Provision of associated car parking at surface level via in-curtilage parking; (c) Provision of electric vehicle charge points with associated site infrastructure ducting to provide charge points for residents throughout the site; (d) Creation of a new access point from the Model Farm Road to facilitate vehicular, pedestrian and cycle access; (e) Provision of internal access roads and footpaths and associated works; (f) The provision of new public amenities to include for public open space to incorporate a football pitch, new boundary treatments, footpaths, surface water drainage all associated / ancillary landscaping and site development works;(g) Provision of an ESB substation; (h) Internal site works and attenuation systems; (i) All ancillary site development/construction works to facilitate foul, water and service networks for connection to the existing foul, water and ESB networks.
- Location
- Dromiskin, Co. Louth Map
- Council
- Louth County Council
- Planning reference
- 2560276
Numbers and dates
- Homes
- ~33estimated from the application
- Floor area
- 4,452 m²per planning documents
- Estimated construction value
- €4.8m to €7.2mOur estimate from stated homes and project type, at January 2026 prices, building works only. Not a stated figure. How we estimate
- Project type
- Large residential
- Received
- 14 May 2025
- Decision to grant
- 28 Oct 2025
- Final grant
- 28 Nov 2025
- Site start notified
- 13 Jul 2026
Timeline
- Application received
- Decision to grant
- Appeal lodged
- Appeal decidedInvalid - late S.127(1)(g)
- Final grant issued
- Site start notified
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file 2560276 on eplanning.ie: drawings, reports and the decision.Open the council's file
- AppealInvalid - late S.127(1)(g) · 500352 / 26 Nov 2025View the appeal record
- From the planning documentsRead from Housing Quality Assessment in the council's file.
- Unit mix
- 11 3 bed, 22 4 bed
- Floor area
- 4,452 m² (per planning documents)
- Site area
- 1.921 ha
- Scope
- The development comprises 33 residential units with associated works including car parking, EV charge points, new access, internal roads, public open space with football pitch, ESB substation, and site development works.
- Solar PV
- “Locations identified for photovoltaic panels”
- Groundworks
- “Internal site works and attenuation systems”
How we know this
From the Louth County Council planning register, checked 2 Jun 2026. We link to the council's own file so you can check the official record before you act. Facts from the planning documents were read from the documents in that file.
Site starts
Commencement notices for this permission
- 13 Jul 2026Notice filed · Construction of 33no. Residential units and associated site development works at Model...View the site start
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.