Infrastructure, Lands at Dundalk North Business Park, Armagh Road, Sportman Hall...
The development will consist of: (1) Construction of a light industrial / manufacturing facility [c.15,967sq.m GFA / height c.14.57m]. The main facility will include manufacturing and warehousing areas at ground floor, with production offices and storage at first floor / mezzanine-levels. Ancillary uses will consist of...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 15 Sep 2025. / Confidence: LowDecision date 15 Sep 2025.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
The development will consist of: (1) Construction of a light industrial / manufacturing facility [c.15,967sq.m GFA / height c.14.57m]. The main facility will include manufacturing and warehousing areas at ground floor, with production offices and storage at first floor / mezzanine-levels. Ancillary uses will consist of research and development (R&D) and office space, a reception / showroom, stair and lift cores, circulation areas, and staff welfare amenities, all extending over two floors in the north and west of...
Named firms
Public source roles
- Cargotec Engineering Ireland Ltd
- Applicant / promoter on the public planning record
- Application role only; current development or appointment status is not confirmed.
- Cbre Advisory (Irl) Ltd
- Planning agent named on the public planning record
- Submission role only; current appointment status is not confirmed.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Louth County Council
- Exact reference
- 2560483
- Evidence reviewed
- 2 Jun 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Infrastructure
The public application record identifies infrastructure in the submitted planning scope.
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- Cargotec Engineering Ireland Ltd
- Planning agent
- Cbre Advisory (Irl) Ltd
- Agent address
- 3rd Floor, Connaught House Burlington Road Dublin D04 C5Y6
More Louth planning activity
These are county discovery links, not claimed relationships to this application.
Application text
The development will consist of: (1) Construction of a light industrial / manufacturing facility [c.15,967sq.m GFA / height c.14.57m]. The main facility will include manufacturing and warehousing areas at ground floor, with production offices and storage at first floor / mezzanine-levels. Ancillary uses will consist of research and development (R&D) and office space, a reception / showroom, stair and lift cores, circulation areas, and staff welfare amenities, all extending over two floors in the north and west of the facility. (2) A pedestrian and vehicular access and egress point to the west of the facility and a HGV access and egress point to the south-west of the facility, both connecting to the internal road network of the Dundalk North Business Park. (3) Provision of 200 no. car parking spaces, including 10 no. accessible spaces and 40 no. electric vehicle (EV) charging spaces, and 14 no. motorcycle parking spaces, located to the west of the facility. (4) Provision of 40 no. covered bicycle parking spaces, located to the north (10 no. spaces) and west (30 no. spaces) of the facility. (5) A service / marshalling yard to the east and south of the facility. (6) Provision of out / utility buildings [c.1,329.9sq.m. GFA], shelter structures, external storage, battery storage, plant, a generator, a transformer, sprinkler tank and pump house. (7) An ESB substation and switchroom to the north-west of the facility. (8) A R&D yard to the north of the facility, comprising of varying terrains and slopes, a viewing platform, a machine wash area, a machine compound, and a bio-retention SuDS area. (9) Provision of site lighting, security fencing, and gates. (10) Installation of PV panels at roof level. (11) Erection of building mounted signage on the north, east and west elevations [(c.5m high x c.3m wide) x 3 no. signs] and an illuminated totem sign located at the facilities main entrance [c.2m high x c.1m wide]. (12) The erection of a retaining wall, an acoustic fence, and a berm with screen planting along the eastern boundary, and a berm with screen planting to the north and west of the R&D yard. (13) All hard and soft landscaping works, including the provision of SuDS features, surface treatments, planting, and boundary treatments. (14) All associated site development works, including above and below ground services, on a site of c.6.39ha.
Application to site progress
-
Applied 25 Jul 2025 2560483
-
Decision Conditional 15 Sep 2025
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2560483
The development will consist of: (1) Construction of a light industrial / manufacturing facility [c.15,967sq.m GFA / height c.14.57m]. The main facility will include manufacturing and warehousing areas at ground floor, with production offices and storage at first floor / mezzanine-levels. Ancillary uses will consist of research and development (R&D) and office space, a reception / showroom, stair and lift cores, circulation areas, and staff welfare amenities, all extending over two floors in the north and west of the facility. (2) A pedestrian and vehicular access and egress point to the west of the facility and a HGV access and egress point to the south-west of the facility, both connecting to the internal road network of the Dundalk North Business Park. (3) Provision of 200 no. car parking spaces, including 10 no. accessible spaces and 40 no. electric vehicle (EV) charging spaces, and 14 no. motorcycle parking spaces, located to the west of the facility. (4) Provision of 40 no. covered bicycle parking spaces, located to the north (10 no. spaces) and west (30 no. spaces) of the facility. (5) A service / marshalling yard to the east and south of the facility. (6) Provision of out / utility buildings [c.1,329.9sq.m. GFA], shelter structures, external storage, battery storage, plant, a generator, a transformer, sprinkler tank and pump house. (7) An ESB substation and switchroom to the north-west of the facility. (8) A R&D yard to the north of the facility, comprising of varying terrains and slopes, a viewing platform, a machine wash area, a machine compound, and a bio-retention SuDS area. (9) Provision of site lighting, security fencing, and gates. (10) Installation of PV panels at roof level. (11) Erection of building mounted signage on the north, east and west elevations [(c.5m high x c.3m wide) x 3 no. signs] and an illuminated totem sign located at the facilities main entrance [c.2m high x c.1m wide]. (12) The erection of a retaining wall, an acoustic fence, and a berm with screen planting along the eastern boundary, and a berm with screen planting to the north and west of the R&D yard. (13) All hard and soft landscaping works, including the provision of SuDS features, surface treatments, planting, and boundary treatments. (14) All associated site development works, including above and below ground services, on a site of c.6.39ha.
Open official record