2 dwellings, Bog Road Mullins Cross, Dunleer, Co. Louth
Permission for: 1) Construction of 1no. two storey detached dwelling house; 2) Construction of 1no. domestic garage; 3) Formation of new site entrance to service proposed dwelling house; 4) Installation of new wastewater treatment system and all associated site development works
The record describes what is sought. Nothing is permitted until the authority decision.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
What the public record evidences
Small residential - 2 dwellings
The public application record identifies 2 dwellings in the submitted planning scope.
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
Named source parties
- Promoter
- Robert McCarthy
- Planning agent
- Declan Walsh
- Agent address
- Main Road Tullyallen Drogheda Co. Louth A92HX72
Application text
Permission for: 1) Construction of 1no. two storey detached dwelling house; 2) Construction of 1no. domestic garage; 3) Formation of new site entrance to service proposed dwelling house; 4) Installation of new wastewater treatment system and all associated site development works
Application to site progress
-
Applied 21 Jul 2026 2660482
-
Decision Decision not recorded yet
-
Appeal No appeal possible yet The application has not been decided.
-
Commenced No commencement indexed A scheme cannot start before it is permitted.
-
Completed Completion not recorded Smaller works often do not require a completion certificate.
Source, scope and limits
Application description and scale 2660482
Permission for: 1) Construction of 1no. two storey detached dwelling house; 2) Construction of 1no. domestic garage; 3) Formation of new site entrance to service proposed dwelling house; 4) Installation of new wastewater treatment system and all associated site development works
Open official record