Infrastructure, Abbvie Castlebar Road (N5), Carrowbeg Westport, Co. Mayo
1) The construction a new Firewater Retention (FWR) facility; 2) The construction a new FWR lifting station and dedicated FWR diversion pipe; 3) The construction of new single storey FWR Utilities Building c. 9.5m x c. 7.0m x c. 5.0m high; 4) The alteration/modification to the existing surface water (SW) and process water (PW)...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 22 Jan 2025. / Confidence: LowDecision date 22 Jan 2025.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
1) The construction a new Firewater Retention (FWR) facility; 2) The construction a new FWR lifting station and dedicated FWR diversion pipe; 3) The construction of new single storey FWR Utilities Building c. 9.5m x c. 7.0m x c. 5.0m high; 4) The alteration/modification to the existing surface water (SW) and process water (PW) drainage networks to facilitate the diversion of the FWR run-off and interconnection with the new FWR diversion pipe; 5) The alterations/modifications to the existing surface finishes and...
Named firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Mayo County Council
- Exact reference
- 2460206
- Evidence reviewed
- 2 Jun 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Infrastructure
The public application record identifies infrastructure in the submitted planning scope.
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- not included in reference feed
- Planning agent
- not included in reference feed
More Mayo planning activity
These are county discovery links, not claimed relationships to this application.
Application text
1) The construction a new Firewater Retention (FWR) facility; 2) The construction a new FWR lifting station and dedicated FWR diversion pipe; 3) The construction of new single storey FWR Utilities Building c. 9.5m x c. 7.0m x c. 5.0m high; 4) The alteration/modification to the existing surface water (SW) and process water (PW) drainage networks to facilitate the diversion of the FWR run-off and interconnection with the new FWR diversion pipe; 5) The alterations/modifications to the existing surface finishes and gradients to facilitate the division of the site into the smaller nominated catchment areas; 6) The demolition of the existing derelict furniture store on the Lodge Road; 7) The construction of a new 152 no. bay car park located to the east of the site in replacement of the existing derelict furniture store on the Lodge Road to be demolished; 8) The construction of a new 119 no. bay car park located to the west of the site adjacent to the existing entrance to the B2 Building; 9) The alterations/extension of the existing permanent contractor’s construction compound north of the Innovation Centre Building, including the construction of a new overflow car park (that currently accommodates 78 no. car parking bays for contractors only) located to the north side of the Campus; and 10) The construction of all associated works including alterations and additions to the existing external tanks, vessels, plant, equipment, external pipe bridge, underground services, external site works such as internal access roads, footpaths, lay down areas, hardstanding areas, external lighting, etc.
Application to site progress
-
Applied 11 Apr 2024 2460206
-
Decision Conditional 22 Jan 2025
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2460206
1) The construction a new Firewater Retention (FWR) facility; 2) The construction a new FWR lifting station and dedicated FWR diversion pipe; 3) The construction of new single storey FWR Utilities Building c. 9.5m x c. 7.0m x c. 5.0m high; 4) The alteration/modification to the existing surface water (SW) and process water (PW) drainage networks to facilitate the diversion of the FWR run-off and interconnection with the new FWR diversion pipe; 5) The alterations/modifications to the existing surface finishes and gradients to facilitate the division of the site into the smaller nominated catchment areas; 6) The demolition of the existing derelict furniture store on the Lodge Road; 7) The construction of a new 152 no. bay car park located to the east of the site in replacement of the existing derelict furniture store on the Lodge Road to be demolished; 8) The construction of a new 119 no. bay car park located to the west of the site adjacent to the existing entrance to the B2 Building; 9) The alterations/extension of the existing permanent contractor’s construction compound north of the Innovation Centre Building, including the construction of a new overflow car park (that currently accommodates 78 no. car parking bays for contractors only) located to the north side of the Campus; and 10) The construction of all associated works including alterations and additions to the existing external tanks, vessels, plant, equipment, external pipe bridge, underground services, external site works such as internal access roads, footpaths, lay down areas, hardstanding areas, external lighting, etc.
Open official record