Energy · Co. Mayo
Works to uprate the existing Cashla, Co. Mayo
Granted 1 Dec 2025 (final grant issued 12 Jan 2026)
Key facts
- Planning application 2560709 at Co. Mayo: Works to uprate the existing Cashla.
- The applicant is Eirgrid Plc. The agent is Darragh Malone.
- It was received by Mayo County Council on 9 Oct 2025.
- Status: Granted 1 Dec 2025 (final grant issued 12 Jan 2026).
- Permission was granted on 1 Dec 2025 and the final grant issued on 12 Jan 2026. No site start has been filed yet. The next step is a commencement notice, filed before building work begins; the start date and who will build it are not known yet.
Source: the Mayo County Council planning register, checked 2 Jun 2026. Open the council's file
What and where
Works to uprate the existing Cashla
EirGrid PLC, with the consent and approval of the Electricity Supply Board (ESB), intends to apply for permission for works to uprate the existing Cashla - Dalton 110 kV overhead line (OHL). Within County Mayo, the proposed development will take place within the following townlands: DALGAN DEMESNE, POLLBAUN, CARROWBEG WEST, GORTEENS, SEEFIN, BROOKHILL, CARROWMORE, BALLYHANKEEN, RUSHBROOK EAST, BALLYCUSHEEN, SCARDAUN WEST, MILLBROOK, MILFORD DEMESNE, CURRAGHADOOEY, LISDUFF, RATHGRANAGHER (MILLER), DRUMMIN WEST, CARROWBEG EAST, RATHGRANAGHER (LINDSAY), CROSSBOYNE, KILBEG-MALONE, DAVROS, DERRY, CLARE, GREAGHANS, COOLROE, ROOS, LEEDAUN The Cashla - Dalton 110 kV OHL circuit runs through County Galway and County Mayo. It is 57.7 km in length and travels from Cashla 110 kV substation in Barrettspark in central County Galway and traverses northwest to the Dalton 110 kV substation (County Mayo). The OHL has a total of 271no. supporting structures. Within the functional area of Mayo County Council, there is 24.7 km of the existing OHL circuit, with 111no. structures. Within the functional area of Galway County Council there is 33.0 km, with 160no. structures. Separate planning applications will be lodged with Galway County Council. The proposed development within Co. Mayo will comprise: • the replacement (“restringing”) of the existing OHL circuit conductor wires with a new higher capacity conductor between structure no. 160 and Dalton 110 kV substation; • the replacement of angle masts in-situ at 6no. locations, with similar structures; • the strengthening of tower foundations at 2no. locations; • the strengthening of towers (i.e., member replacement) at 6no. locations; • the painting of towers at 7no. locations; • shear block remedial works of a tower at 1no. location; • the replacement of polesets at 83no. locations, with similar structures. The change in structures will result in standardised heights from 16 m to 23 m along the circuit. The majority of the height increases will be between 0.1 m and 2.0 m (at 70no. structures), with 12no. structure replacements resulting in no change in height. Structure no. 263 will increase in height by 7.0m; • the replacement of insulating and ancillary hardware at all structures from structure no. 161 to 271; • the replacement of earthwire between structure no. 261 and structure no. 271; • the replacement of stay wire / anchors and associated fittings at 7no. locations; • the replacement of crossarms at 7
- Location
- Co. Mayo Map
- Council
- Mayo County Council
- Planning reference
- 2560709
- Applicant
- Eirgrid Plc
- Agent
- Darragh Malone
Numbers and dates
- Project type
- Energy
- Received
- 9 Oct 2025
- Decision to grant
- 1 Dec 2025
- Final grant
- 12 Jan 2026
Timeline
- Application received
- Decision to grant
- Final grant issued
Outlook
What happens next
Documents and evidence
Check the record
- Council planning fileThe application file 2560709 on eplanning.ie: drawings, reports and the decision.Open the council's file
How we know this
From the Mayo County Council planning register, checked 2 Jun 2026. We link to the council's own file so you can check the official record before you act.