Pending appeal of the Mayo 2660398 wind-farm proposal. The retained council record reports refusal 13 July 2026; the inspected May 2026 EIAR describes a seven-turbine proposal and a separate grid-consent process, not approved or installed works.
Seven 160 m turbines;31.5 MW is an assessment assumption
Proposed in application · Mayo 2660398 wind-farm application; the separately consented grid connection is contextual
What the evidence says
The wind-farm application proposes seven turbines with 160 m tip height,92 m hub height and 136 m rotor diameter. The EIAR uses 4.5 MW per turbine to illustrate 31.5 MW, while expressly leaving generating capacity to the selected manufacturer. The separate 110 kV grid application is assessed in the same EIAR but follows a different consenting process.
Why it may matter — interpretation
Interpretation for turbine suppliers and planners: separates the proposed dimensional envelope from an assumed output and prevents shared EIAR content being mistaken for one permission.
What is not established
No turbine manufacturer, final generating capacity, permission, installed equipment or procurement status is established. The grid substation and off-site route are not added to the wind-farm consent.
Inspect the evidence
Cunlaghfadda EIAR Chapter 4: Description, part 1 · p.5
dual consenting process · Issued 2026-05-14 · Chapter 4 Final 2026.05.14; embedded engineering figures P01 dated 14 May 2026; received 2026-05-20 · Checked 2026-09-05
dual consenting process
Cunlaghfadda EIAR Chapter 4: Description, part 1 · p.13
Rotor Diameter of 136 metres · Issued 2026-05-14 · Chapter 4 Final 2026.05.14; embedded engineering figures P01 dated 14 May 2026; received 2026-05-20 · Checked 2026-09-05
Rotor Diameter of 136 metres
Cunlaghfadda EIAR Chapter 4: Description, part 1 · p.18
rated generating capacity of 4.5MW · Issued 2026-05-14 · Chapter 4 Final 2026.05.14; embedded engineering figures P01 dated 14 May 2026; received 2026-05-20 · Checked 2026-09-05
rated generating capacity of 4.5MW
Reinforced-concrete foundations use an assessed 25 m envelope
Proposed in application · Proposed turbine gravity foundations; assessed envelope rather than an installed design
What the evidence says
The EIAR assesses foundations up to approximately 25 m horizontally and 3.5 m vertically, with an anchor cage and reinforcing steel. The embedded gravity-foundation drawing shows the 3.0–3.5 m foundation level separately from the deeper 4.0–4.5 m excavation. Final design depends on ground conditions and the turbine supplier.
Why it may matter — interpretation
Interpretation for concrete and groundworks specialists: distinguishes the foundation from its excavation and identifies the design dependency.
What is not established
No concrete volume, reinforcement tonnage, supplier or exact excavation at every turbine is established.
Inspect the evidence
Cunlaghfadda EIAR Chapter 4: Description, part 1 · p.15
approximately 25m and 3.5m · Issued 2026-05-14 · Chapter 4 Final 2026.05.14; embedded engineering figures P01 dated 14 May 2026; received 2026-05-20 · Checked 2026-09-05
approximately 25m and 3.5m
Cunlaghfadda EIAR Chapter 4: Description, part 1 · p.16
4.0 - 4.5m · Issued 2026-05-14 · Chapter 4 Final 2026.05.14; embedded engineering figures P01 dated 14 May 2026; received 2026-05-20 · Checked 2026-09-05
4.0 - 4.5m
The 20/33 kV detail shows 110 mm power ducts and 50 mm fibre ducting
Proposed in application · Internal turbine-to-substation cabling; typical on-track and off-track sections
What the evidence says
The proposed internal cable system uses 20/33 kV electricity and fibre communications. Figure 4-7 shows 110 mm power ducts with 12 mm draw ropes,50 mm solid-wall fibre ducting, a 600 mm trench width, yellow warning tape and Clause 804 backfill. The narrative allows the final duct number/configuration to change at detailed electrical design and requires clay plugs at intervals no greater than 50 m where needed.
Why it may matter — interpretation
Interpretation for electrical and civil trades: identifies ducting, backfill and runoff-barrier coordination while preserving the typical-section limitation.
What is not established
No route-wide duct quantity or final cable specification is established. The separate 110 kV export connection must not inherit this 20/33 kV section.
Inspect the evidence
Cunlaghfadda EIAR Chapter 4: Description, part 1 · p.19
not greater than 50 metres · Issued 2026-05-14 · Chapter 4 Final 2026.05.14; embedded engineering figures P01 dated 14 May 2026; received 2026-05-20 · Checked 2026-09-05
not greater than 50 metres
Cunlaghfadda EIAR Chapter 4: Description, part 1 · p.21
110mm Diameter Ducts · Issued 2026-05-14 · Chapter 4 Final 2026.05.14; embedded engineering figures P01 dated 14 May 2026; received 2026-05-20 · Checked 2026-09-05
110mm Diameter Ducts
Clean runoff uses level spreaders with site-dependent dimensions
Proposed in application · Drainage measures in the combined project EIAR; individual locations and lengths remain design-dependent
What the evidence says
The drainage strategy separates clean runoff from sediment-bearing construction water. Its level-spreader detail specifies a lip 150 mm above the ground behind it and a length between 4 m and 25 m, selected for the contributing catchment and ground conditions. The lip can be concrete kerb, timber board, pipe or a similar level-edged material.
Why it may matter — interpretation
Interpretation for drainage and landscaping trades: identifies a defined runoff-dissipation work with material alternatives.
What is not established
No number of spreaders, selected lip material, combined length or installed drainage system is established.
Inspect the evidence
Cunlaghfadda EIAR Chapter 4: Description, part 2 · p.20
Two distinct methods · Issued 2026-05-14 · Chapter 4 Final 2026.05.14; embedded engineering figures P01 dated 14 May 2026; received 2026-05-20 · Checked 2026-09-05
Two distinct methods
Cunlaghfadda EIAR Chapter 4: Description, part 2 · p.23
minimum of four metres · Issued 2026-05-14 · Chapter 4 Final 2026.05.14; embedded engineering figures P01 dated 14 May 2026; received 2026-05-20 · Checked 2026-09-05
minimum of four metres
Selected pages of 2 government-published PDFs were visually inspected. One hundred and seventeen Commission file links catalogued. Two PDFs comprising parts of the same EIAR chapter were accessed, with 11 selected pages visually inspected; the remaining document families and all pages were not exhaustively reviewed. Proposals do not establish procurement or installed work.