Energy, SSE Thermal Tawnaghmore Power Station, Tawnaghmore Upper, Killala Co. Mayo
The Application will replace the previous consented (but unbuilt) BESS facility granted under planning ref (25/60108). The development will consist of the following elements: • BESS facility including battery containers with integrated HVAC (heating, Ventilation, Air Conditioning) units, transformers, inverters, underground...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 11 Aug 2026. / Confidence: LowDecision date 11 Aug 2026.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
The Application will replace the previous consented (but unbuilt) BESS facility granted under planning ref (25/60108). The development will consist of the following elements: • BESS facility including battery containers with integrated HVAC (heating, Ventilation, Air Conditioning) units, transformers, inverters, underground cabling, internal access roads, lighting, CCTV and perimeter fencing; • Associated Electrical Compound consisting of a Low Voltage Operations Independent Power Producer (IPP) Compound...
Named firms
Public source roles
- Sse Renewables Ireland Ltd
- Applicant / promoter on the public planning record
- Application role only; current development or appointment status is not confirmed.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Mayo County Council
- Exact reference
- 2660480
- Evidence reviewed
- 7 Sep 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Energy
The public application record identifies energy in the submitted planning scope.
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- Sse Renewables Ireland Ltd
- Planning agent
- Caitriona Fox
- Agent address
- Malachy Walsh and Partners ReenPoint, Blennerville, Tralee Co. Kerry V92 X2TK
More Mayo planning activity
These are county discovery links, not claimed relationships to this application.
Application text
The Application will replace the previous consented (but unbuilt) BESS facility granted under planning ref (25/60108). The development will consist of the following elements: • BESS facility including battery containers with integrated HVAC (heating, Ventilation, Air Conditioning) units, transformers, inverters, underground cabling, internal access roads, lighting, CCTV and perimeter fencing; • Associated Electrical Compound consisting of a Low Voltage Operations Independent Power Producer (IPP) Compound including a single storey control and operations building, switchgear room, storage container, car parking, welfare/office facilities; • High voltage electrical yard and Eirgrid 110kV substation building; • 264 meters long 110kV single circuit underground grid connection (UGC) within SSE lands and 119 meters within the existing ESB 110kV Substation lands to facilitate the grid connection to the existing adjacent Tawnaghmore substation; • Proposed internal access tracks to BESS facility, including 4 no. new gate entrances • Reinforced concrete and retaining walls; • A temporary construction compound and associated temporary infrastructure to facilitate the development; • Associated landscaping, drainage, decommissioning of existing septic tank and ancillary works. A 10-year permission is sought in respect of the development. Certain details of the proposed development are unconfirmed in the planning application, and an opinion on unconfirmed details accompanies the application. The Tawnaghmore Power Station has an Environmental Protection Agency (EPA) issued Industrial Emissions (IE) Licence (Reg, No. P0566-02).
Application to site progress
-
Applied 19 Jun 2026 2660480
-
Decision Conditional 11 Aug 2026
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2660480
The Application will replace the previous consented (but unbuilt) BESS facility granted under planning ref (25/60108). The development will consist of the following elements: • BESS facility including battery containers with integrated HVAC (heating, Ventilation, Air Conditioning) units, transformers, inverters, underground cabling, internal access roads, lighting, CCTV and perimeter fencing; • Associated Electrical Compound consisting of a Low Voltage Operations Independent Power Producer (IPP) Compound including a single storey control and operations building, switchgear room, storage container, car parking, welfare/office facilities; • High voltage electrical yard and Eirgrid 110kV substation building; • 264 meters long 110kV single circuit underground grid connection (UGC) within SSE lands and 119 meters within the existing ESB 110kV Substation lands to facilitate the grid connection to the existing adjacent Tawnaghmore substation; • Proposed internal access tracks to BESS facility, including 4 no. new gate entrances • Reinforced concrete and retaining walls; • A temporary construction compound and associated temporary infrastructure to facilitate the development; • Associated landscaping, drainage, decommissioning of existing septic tank and ancillary works. A 10-year permission is sought in respect of the development. Certain details of the proposed development are unconfirmed in the planning application, and an opinion on unconfirmed details accompanies the application. The Tawnaghmore Power Station has an Environmental Protection Agency (EPA) issued Industrial Emissions (IE) Licence (Reg, No. P0566-02).
Open official record