Infrastructure, Lecarrow Crossmolina Abbeytown Knockalegan Glebe Gortskeddia... - Planning Application 2660511

Mayo / Lecarrow Crossmolina Abbeytown Knockalegan Glebe Gortskeddia Ballina Abbeyhalfquarter Knocknalyre and Bunree / Lecarrow Crossmolina Abbeytown Knockalegan Glebe Gortskeddia Ballina Abbeyhalfquarter Knocknalyre and Bunree, Lecarrow Crossmolina Abbeytown Knockalegan Glebe Gortskeddia Ballina Abbeyhalfquarter Knocknalyre and Bunree, Co. Mayo

Est. value Not listed
Units Not listed
Floor area Not listed
Decision due 24 Aug 2026

Source-linked planning record

Infrastructure, Lecarrow Crossmolina Abbeytown Knockalegan Glebe Gortskeddia... - Planning Application 2660511

Mayo / Lecarrow Crossmolina Abbeytown Knockalegan Glebe Gortskeddia Ballina Abbeyhalfquarter Knocknalyre and Bunree / Lecarrow Crossmolina Abbeytown Knockalegan Glebe Gortskeddia Ballina Abbeyhalfquarter Knocknalyre and Bunree, Lecarrow Crossmolina Abbeytown Knockalegan Glebe Gortskeddia Ballina Abbeyhalfquarter Knocknalyre and Bunree, Co. Mayo
PB ref
PB--3415953807
Plan ref
2660511
Authority
Mayo County Council
Stage / date
New Application / 24 Aug 2026
Est. value band
Value not disclosed
Project class
Infrastructure
Promoter
Bord Na Móna Powergen Ltd
Architect / agent
Darragh Hobbs

Source: http://www.eplanning.ie/MayoCC/AppFileRefDetails/2660511/0

Key facts

Lead summary

Source
Mayo County Council public planning register
Planning authority
Mayo County Council
Application reference
2660511
Applicant
Bord Na Móna Powergen Ltd
Agent
Darragh Hobbs
Decision stage
New Application
Decision due
24 Aug 2026

Official description

Verbatim source text

Bord na Móna Powergen Ltd., intend to apply for permission for proposed minor temporary and permanent works to facilitate the delivery of turbine components to the permitted Oweninny Wind Farm Phase 3 (Ref. PA16.316178). The Turbine Delivery Route (TDR) will originate at the port of entry at Killybegs Harbour, Co. Donegal, runs through Co. Sligo, Co. Leitrim and terminate at the consented Oweninny Wind Farm Phase 3 site, Co. Mayo. The total length of the TDR is c.188km of which c.65km is within Co. Donegal, c.57km in Co. Sligo, and c.36km in Co. Mayo. Minor temporary and permanent works are not proposed along this entire route but only at select locations. The total area of the works proposed in Co. Mayo is 5.87 Hectares (Ha). The proposed development within Co. County Mayo comprises both temporary and permanent works located in the townlands Lecarrow, Crossmolina, Abbeytown, Knockalegan, Glebe, Gortskeddia, Ballina, Abbeyhalfquarter, Knocknalyre and Bunree. The works are required to accommodate delivery of Abnormal Indivisible Loads (AIL) and will consist of: • Laying of temporary load bearing surfaces at 6 No. locations • Temporary modification to street furniture (traffic lights, bench, junction boxes, wall and part of a bridge parapet/railing) at 1No. location • Temporary removal of street lighting, bollard and tree removal at 1No. location. • Temporary removal of a wall and gate, berm regarding, hedge trimming and temporary modification to street furniture at 1No location. • Temporary removal of wall and vegetation as well as temporary modifications to street furniture at 1No. location • Temporary entrance to be constructed at 3 No. locations • Construction of a dual-purpose permanent access and public amenity track of approx. 2.7km at Crossmolina, Co. Mayo • Construction of permanent bridge crossing of the River Deel at Crossmolina, Co. Mayo • Installation of permanent lighting along the access and amenity track at Crossmolina, Co. Mayo • Installation of permanent sustainable drainage system along the access and amenity track at Crossmolina, Co. Mayo • Installation of temporary construction compound to include site offices, welfare facilities and car parking at Crossmolina Co. Mayo. • Reinstatement of all temporary works areas to previous condition • All associated and ancillary works required for the accommodation works and construction for the TDR. Permission is sought for a period of 10 years. Separate applications wil

Verify against official source

Project team

Named source parties

Promoter
Bord Na Móna Powergen Ltd
Planning agent
Darragh Hobbs
Agent address
Fairgreen House Fairgreen Rd Galway H91AXK8

Lifecycle timeline

Application to site progress

  1. Applied

    30 Jun 2026 2660511
  2. Decision

    N/A
  3. Commenced

    No commencement indexed Owner-export and BCMS records are indexed only when a reliable source link exists.
  4. Completed

    Completion not recorded Smaller works often do not require a completion certificate.

Likely trades & supplier leads

Inferred from scheme type and scale

ComplianceElectricalGroundworksHealth & SafetyMain contractorMechanicalSolar/Energy
Board this lead Create alert