Infrastructure · Co. Meath
Development will consist of, Main Street, Co. Meath
Granted 18 Jan 2023
Key facts
- Planning application 221509 at Main Street, Co. Meath: Development will consist of.
- It was received by Meath County Council on 18 Nov 2022.
- Status: Granted 18 Jan 2023.
Source: the Meath County Council planning register, as last seen on 2 Jun 2026. Open the council's file
More planning applications in Main Street · Planning applications in Co. Meath
Since you last looked
Worked out in this browser from the record's own dates. We do not send emails about it.
Council register
The council's register shows: Granted on 18 Jan 2023.
Search the Meath planning register
Application details as we last saw them in the national register on 2 Jun 2026.
What and where
Development will consist of
the development will consist of: construction of a single storey discount foodstore of 2200 gross floor area (GFA) with a net sales area of 1,409sqms with an ancillary off license sales area; car parking for 119 cars including accessible spaces, cycle parking and electric vehicle parking spaces (circa 20% of spaces will be wired for future EV parking). The store will include photovoltaic panels at roof level; trolley bay with cycle parking; bin store and new ESB Substation building as well as a pedestrian and cycle link connecting to the northern boundary in line with the current termination of the existing pedestrian path extending along the eastern elevation of the Supervalu store to the northern boundary of the subject site. There is also provision for future pedestrian and vehicle link from the proposed access road to lands to the east of the application site. The construction of a single storey café unit (165sqms) positioned adjacent to a proposed plaza area which together are located in the existing car park area to the west of St. Peter and St. Paul's Church ('The Church'). The vehicular entrance to the development will be approximately in the same location as the entrance to the existing car park, west of The Church. The existing ESB substation in this area will remain in place. The café will also have an enclosed bin store. The construction of a new car park (53 spaces) located to the north east of the Church and for its exclusive use. It will be connected to the internal grounds of The Church via a two-way connection. The main entrance and exit will be onto the access road serving the proposed foodstore. This access road in turn will have a footpath along its east side, running parallel with The Church boundary. There will also be a crossing point from the existing pedestrian connection on the north west boundary of The Church. For clarity the majority of the existing north east, walled, boundary of The Church is proposed for removal along most of its length to facilitate the operation of the new Church car park. The application also includes works and road markings to improve traffic management related to Vehicular access to and from the site on Main Street. A right turn lane is proposed on Main Street with works to the public space located to the south west of Main Street including alterations to kerbs lines; minor relocation of one disabled parking space and relocation of bollards and other works to footpaths as required. ……...
Description as published by the council. Its text starts part-way through a sentence.
- Location
- Main Street, Co. Meath Map
- Council
- Meath County Council
- Planning reference
- 221509
Numbers and dates
- Project type
- Infrastructure
- Received
- 18 Nov 2022
- Granted
- 18 Jan 2023
- Site start
- 2 Dec 2024
Timeline
- Application received
- Granted
- Appeal lodged
- Appeal decidedGrant permission with conditions
- Site start
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file 221509 on eplanning.ie: drawings, reports and the decision.Open the council's file
- AppealGrant permission with conditions · 315651 / 30 May 2024View the appeal record
How we know this
From the Meath County Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.
Site starts
Site starts and completion
- 2 Dec 2024Work started · phase 1 · The proposed Lidl Discount Retail Store consists of a retail sales area, storage areas...
- 2 Dec 2024Work started · phase 2 · Proposed stand-alone single storey ESB Sub-station/Switchroom room. circa 22.60m2 gross...
- Completion certificate recordedRecorded in Dec 2024 · 1 unit on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 4 Oct 2026.
- Completion certificate recordedRecorded in Dec 2024 · 1 unit on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 4 Oct 2026.
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.
Explore the area