Planning application · Co. Meath

Following Large-Scale Residential Development, Dunboyne North, Co. Meath

Granted on appeal 20 Nov 2024 (Decision to grant 4 Jun 2024 by the council)

We no longer update this application, so we can't email you about it. Get new planning applications in Dunboyne North by email

Key facts

  • Planning application 2360290 at Dunboyne North, Co. Meath: Following Large-Scale Residential Development.
  • The applicant is Marina Quarter Ltd..
  • It was received by Meath County Council on 21 Sep 2023.
  • Status: Granted on appeal 20 Nov 2024 (Decision to grant 4 Jun 2024 by the council).
  • Work was due to start on 7 Jul 2026, according to the commencement notice. It does not say which contractors or suppliers are appointed.

Source: the Meath County Council planning register, as last seen on 2 Jun 2026. Open the council's file

More planning applications in Dunboyne North · Planning applications in Co. Meath

Council register

The council's register shows: Decision to grant on 4 Jun 2024.

Application details as we last saw them in the national register on 2 Jun 2026.

What and where

Following Large-Scale Residential Development

Permission for the following Large-Scale Residential Development consisting of: i) 267 no. residential units comprising 145 no. dwelling houses and 122 no. apartments/duplexes providing a mix of 1, 2, 3 and 4-bed units. The dwelling houses range in height from 2-3 storeys. The apartments/duplexes are in 8 no. blocks (i.e. Blocks A-H, with Blocks B and C joined) ranging in height from 3 to 5 storeys; ii) a single storey creche; iii) modifications to the R157 regional road including changes to the existing carriageway/traffic lanes and the replacement of an existing roundabout with a new signalised junction; iv) a new signalised junction and link road (including new bridge over the River Tolka) connecting the R157 and the Old Navan Road; v) the provision of footpaths, cycle lanes and 2 no. pedestrian crossings on the existing M3 Parkway access road, vi) a foul pumping station and connection to the existing public sewerage system via the Old Navan Road; vii) a watermain connection to the north of the site at Pace (townland); viii) 3 no. ESB substation/kiosks and the undergrounding/re-routing of existing electricity lines; ix) reprofiling of land and relocation of existing berm adjoining the River Tolka as part of flood mitigation measures; and x) all associated ancillary development works including footpaths, cycle lanes, car and bicycle parking, drainage, public lighting, bin storage, boundary treatments and landscaping/amenity areas at this site measuring 14.17 hectares principally located in Bennetstown (townland) to the south of the M3 Parkway park and ride and rail station, and also extending into Pace & Dunboyne (townlands), Dunboyne North, Co. Meath. Access will be via 2 no. new vehicular access points along the new link road between the R157 and the Old Navan Road. Pedestrian access will also be provided on to the existing M3 Parkway access road. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) has been submitted to the planning authority with the application. Significant further information/revised plans submitted with this application

Location
Dunboyne North, Co. Meath Map
Planning reference
2360290

Numbers and dates

Received
21 Sep 2023
Council decision
4 Jun 2024
Appeal lodged
28 Jun 2024
Granted on appeal
20 Nov 2024
Site start notified
7 Jul 2026

Timeline

  1. Application received
  2. Decision to grant by the council
  3. Appeal lodged
  4. Appeal decidedGrant permission with revised conditions
  5. Site start notified

Outlook

What happens next

Work was due to start on 7 Jul 2026, according to the commencement notice. It does not say which contractors or suppliers are appointed. View the site start

Work packages named so far

  • Roads and site development worksNamed in the application description
  • Services and drainageNamed in the application description
  • Crèche or childcare facilityNamed in the application description
  • LandscapingNamed in the planning documents
  • WastewaterNamed in the planning documents

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning fileThe application file 2360290 on eplanning.ie: drawings, reports and the decision.Open the council's file
  • AppealGrant permission with revised conditions · 320049 / 20 Nov 2024View the appeal record
  • From the planning documentsRead from Planning Report in the council's file.
    Unit mix
    28 1-bed apartments, 144 2-bed units, 87 3-bed units, 8 4-bed houses
    Site area
    14.17 ha
    Applicant in the planning documents
    Marina Quarter Ltd.
    Phasing
    Phase 1 of a larger masterplan area; future phases to the west.
    Scope
    Construction of 267 residential units, a creche, a new link road with bridge over the River Tolka, signalised junctions, and associated site works.
    Landscaping
    “Landscaping/amenity areas included in associated works.”
    Wastewater
    “Foul pumping station and connection to existing public sewerage system.”

Reviewed build intelligence

What the documents establish

Government document review

W32 contains two pending LRD appeals lodged7August2026. The May2026 amendment report describes124 apartments replacing76 in Phase1, yielding315 rather than267+124. Its account of earlier permissions/construction is a dated consultant statement in the official file, not an independent current permission/completion check.

1 official documents inspected · Checked 2026-09-05 · Official file index

124 apartments replace76; proposed Phase1 total315

Proposed amendment; outcome pending · Phase1 apartment amendment under2660607, within the earlier2360290 scheme

What the evidence says
The amendment replaces76 apartments with124 in BlocksA/B/C, an increase of48. Table2 changes the overall Phase1 total from267 to315 while145 houses remain unchanged.

Why it may matter — interpretation
Interpretation for designers and quantity surveyors: scope the48-unit increase and revised apartment mix; do not treat all124 as additional dwellings.

What is not established
Both current appeals are pending. The final approved unit schedule, installed works and procurement availability are not established. Inspect the eventual orders and reconciled schedule.

Inspect the evidence

EIAR Addendum Report: Dunboyne Phase 1 Amendment · p.7
Inspected PDF page 7 · Issued May 2026 (month only) · RevisionA, submitted; stamped received21May2026 · Checked 2026-09-05

267 no. units / 315 no. units / +48

The amendment changes parking and cycle provision

Proposed amendment; outcome pending · Overall Phase1 comparison table in the May2026 apartment amendment

What the evidence says
Table2 changes Phase1 parking from357 to366 spaces (+7 standard and+2 GoCar), and cycle parking from649 to671 (+30 secure,−8 visitor); the280m²/65-place creche is unchanged.

Why it may matter — interpretation
Interpretation for civil and cycle-parking suppliers: the revised provision identifies specific layout/equipment scope to compare with the approved drawings.

What is not established
No equipment appointment or installed counts are proven. Confirm the final parking/landscape schedule after the appeals.

Inspect the evidence

EIAR Addendum Report: Dunboyne Phase 1 Amendment · p.8
Inspected PDF page 8 · Issued May 2026 (month only) · RevisionA, submitted; stamped received21May2026 · Checked 2026-09-05

357 no. car spaces / 366 no. car spaces
Remaining document questions
  • Both current appeals are pending. The final approved unit schedule, installed works and procurement availability are not established. Inspect the eventual orders and reconciled schedule.
  • No equipment appointment or installed counts are proven. Confirm the final parking/landscape schedule after the appeals.

ACP324557 links one92-page EIAR addendum; selected pages5,7,8 visually inspected. ACP324555 currently links noPDF. No whole-file or construction/compliance review. Issue monthMay2026 is preserved; received stamp21May2026 is distinct.

How we know this

From the Meath County Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record. Facts from the planning documents were read from the documents in that file.

Site starts

Commencement notices for this permission

  1. 7 Jul 2026Notice filed · Construction of a new Creche (BX01 - Shell and core works only) and associated site works.View the site start

A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.

Explore the area

More planning activity near Dunboyne North

Get alerts for Dunboyne NorthFree. We email you when new applications appear.

Free email alerts

Get new Dunboyne North projects by email

New applications, decisions and site starts in Dunboyne North, Co. Meath. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

More alert options