Planning application · Co. Meath

Summerhill, Meath

Site start 30 Sep 2024

Archived record

This application has left our current planning lists, so this page is no longer updated. We last saw it in the council's register on 10 Jun 2026. The details below are as they were then. The council's register has the current status.

What and where

~14 homes

The proposed development will consist of the construction of 14 No. terraced houses designed in 4 rows. Six No. 2 Bed 4P 2 Storey and Eight No. 3 Bed 5P 2 Storey units together with the required open space. Remodelling and widening of the existing vehicular entrance from the R158 to create a shared surface access road. New pedestrian and cycle access point to Cherry Court Estate to the south of the proposed development. Additional works include the provision of vehicular access, solar panels at roof level, all landscaping, boundary treatment works, new drainage connections to public foul and surface water mains as well as all associated and ancillary site and groundworks. Significant further information/revised plans submitted on this application

Location
Summerhill, Co. Meath Map
Planning reference
2360309
Applicant
Drumlargan Construction
Agent
Drumlargan Construction

Key facts

Homes
~14estimated from the application
Floor area
1,224 m²
Site start
30 Sep 2024

Documents and evidence

Check the record

  • Council planning fileThe application file 2360309 on eplanning.ie: drawings, reports and the decision.Open the council's file
  • From the planning documentsRead from Civil Engineering Planning Report in the council's file.
    Unit mix
    6 2-bedroom (Type A), 6 3-bedroom (Type B), 2 3-bedroom (Type C)
    Site area
    0.5 ha
    Applicant
    Drumlargan Construction Ltd
    Phasing
    Single phase
    Scope
    Proposed residential development of 14 two-storey dwellings with associated access, drainage, solar panels, landscaping, and groundworks.
    Rainwater
    “Rainwater from roofs collected via guttering and downpipes into soakaways and waterbutts.”
    Wastewater
    “Each house connects directly to existing 450mm DIA foul water network via saddle connection.”
    Solar PV
    “Solar panels at roof level included in works.”
    Landscaping
    “Landscaping and boundary treatment works included.”
    Groundworks
    “Site and groundworks including cut and fill to level site.”

How we know this

From the Meath County Council planning register, as last seen on 10 Jun 2026. The council's own file is the official record. Facts from the planning documents were read from the documents in that file.

Site starts

Site starts and completion

  1. 30 Sep 2024Work started · Construction of 13 No. terraced houses designed in 4 separate blocks and all...
  2. Completion certificate recordedRecorded in Sep 2024 · 13 units on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Sep 2026.

A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.

Explore the area

More planning activity near Summerhill

Get alerts for SummerhillFree. We email you when new applications appear.

Free email alerts

Get new Summerhill projects by email

New planning applications, decisions and site starts in Summerhill, Co. Meath. We only email when something new appears.

How often

We send a confirmation link first. No alerts until you click it.

Follow this applicationMore alert options