Infrastructure, Lands at City North Business Campus, Stamullen, Co Meath
1. Permission for a warehouse unit with a cumulative gross floor area of 6806.3sq.m of which the warehouse area comprises 4674.4sq.m at ground floor along with a mezzanine floor area comprising 351.8sq.m, the provision of a ground floor office and staff areas comprising 760.4sq.m along with a first floor office comprising...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 29 Apr 2025. / Confidence: LowDecision date 29 Apr 2025.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
1. Permission for a warehouse unit with a cumulative gross floor area of 6806.3sq.m of which the warehouse area comprises 4674.4sq.m at ground floor along with a mezzanine floor area comprising 351.8sq.m, the provision of a ground floor office and staff areas comprising 760.4sq.m along with a first floor office comprising 484.2sq.m and a second floor plant storage area comprising 525.4sq.m. The warehouse building will have an overall height of 14.65 metres. 2. Vehicular access will utilise the existing City North...
Named firms
Public source roles
- Millmount Healthcare Ltd
- Applicant / promoter on the public planning record
- Application role only; current development or appointment status is not confirmed.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Meath County Council
- Exact reference
- 2560225
- Evidence reviewed
- 2 Jun 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Infrastructure
The public application record identifies infrastructure in the submitted planning scope.
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- Millmount Healthcare Ltd
- Planning agent
- Ronan Woods
- Agent address
- Genesis Planning Consultants Dean Swift Building Armagh Business Park, Hamiltonsbawn Road, BT601HW
More Meath planning activity
These are county discovery links, not claimed relationships to this application.
Application text
1. Permission for a warehouse unit with a cumulative gross floor area of 6806.3sq.m of which the warehouse area comprises 4674.4sq.m at ground floor along with a mezzanine floor area comprising 351.8sq.m, the provision of a ground floor office and staff areas comprising 760.4sq.m along with a first floor office comprising 484.2sq.m and a second floor plant storage area comprising 525.4sq.m. The warehouse building will have an overall height of 14.65 metres. 2. Vehicular access will utilise the existing City North Campus Estate roads. 3. The development of associated internal access roads, turning/loading areas, footways, parking areas, electric vehicle charge points and associated ducting, landscaping, lighting, fencing, bicycle and bin storage facilities and associated site works. 4. The provision of façade signage along with provision of a totem sign. 5.The provision of an ESB substation. 6. Provision of attenuation tanks and associated infrastructure as part of the surface water system along with installation of a bypass hydrocarbon interceptor. 7. All ancillary site development, landscaping and construction works to facilitate foul, water and service network connections. An Environmental Impact Assessment Report (EIAR) has been prepared in respect of the proposed development and accompanies this application.
Application to site progress
-
Applied 6 Mar 2025 2560225
-
Decision Conditional 29 Apr 2025
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2560225
1. Permission for a warehouse unit with a cumulative gross floor area of 6806.3sq.m of which the warehouse area comprises 4674.4sq.m at ground floor along with a mezzanine floor area comprising 351.8sq.m, the provision of a ground floor office and staff areas comprising 760.4sq.m along with a first floor office comprising 484.2sq.m and a second floor plant storage area comprising 525.4sq.m. The warehouse building will have an overall height of 14.65 metres. 2. Vehicular access will utilise the existing City North Campus Estate roads. 3. The development of associated internal access roads, turning/loading areas, footways, parking areas, electric vehicle charge points and associated ducting, landscaping, lighting, fencing, bicycle and bin storage facilities and associated site works. 4. The provision of façade signage along with provision of a totem sign. 5.The provision of an ESB substation. 6. Provision of attenuation tanks and associated infrastructure as part of the surface water system along with installation of a bypass hydrocarbon interceptor. 7. All ancillary site development, landscaping and construction works to facilitate foul, water and service network connections. An Environmental Impact Assessment Report (EIAR) has been prepared in respect of the proposed development and accompanies this application.