Infrastructure, Lands at City North Business Campus, Stamullen, Co Meath
Granted · Lands at City North Business Campus, Stamullen, Co Meath
Qualified scale is available from the current public evidence. Planning and event-specific quantities remain separate below.
Planning lead
Current planning presentation
1. Permission for a warehouse unit with a cumulative gross floor area of 6806.3sq.m of which the warehouse area comprises 4674.4sq.m at ground floor along with a mezzanine floor area comprising 351.8sq.m, the provision of a ground floor office and staff areas comprising 760.4sq.m along with a first floor office comprising 484.2sq.m and a second floor plant storage area comprising 525.4sq.m. The warehouse building will have an overall height of 14.65 metres. 2. Vehicular access will utilise the existing City North Campus Estate roads. 3. The development of associated internal access roads, turning/loading areas, footways, parking areas, electric vehicle charge points and associated ducting, landscaping, lighting, fencing, bicycle and bin storage facilities and associated site works. 4. The provision of façade signage along with provision of a totem sign. 5.The provision of an ESB substation. 6. Provision of attenuation tanks and associated infrastructure as part of the surface water system along with installation of a bypass hydrocarbon interceptor. 7. All ancillary site development, landscaping and construction works to facilitate foul, water and service network connections. An Environmental Impact Assessment Report (EIAR) has been prepared in respect of the proposed development and accompanies this application.
- Planning authority
- meathcountycouncil
- Lead planning reference
- 2560225
- Application date
- 6 Mar 2025
- Decision date
- 29 Apr 2025
- Project type
- Infrastructure
- Value band
- €30m+
- Public promoter
- Millmount Healthcare Limited
- Public agent
- Ronan Woods
Exact evidence
Planning records
2560225 · Planning application
Meath County Council · CONDITIONAL · 2025-04-29
Open official recordPlanning-case scale and each commencement-event quantity remain separate; notice quantities are never added into a project total.
Building control evidence
Separate commencement events
SN0014182MH · 2026-05-20
Construction of warehouse and all Ancillary works.
6800 m² · Source-stated event-specific quantity
Planning-case scale and each commencement-event quantity remain separate; notice quantities are never added into a project total.
Appeal evidence
Appeals
No appeal event is linked.
Completion evidence
Completion records
No completion evidence is linked.