Infrastructure, Carranstown and Caulstown, Platin Duleek, Co. Meath
the proposed amendments include: 1) Removal of the gas turbine buildings housing the approved OCGT units (Turbines, generators and auxiliary equipment). The OCGT units will remain in place; 2) Addition of FinFan cooler unit and associated plant; 3) Revised Water Treatment Plant (‘WTP’) design and layout, incorporating...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 4 Nov 2025. / Confidence: LowDecision date 4 Nov 2025.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
the proposed amendments include: 1) Removal of the gas turbine buildings housing the approved OCGT units (Turbines, generators and auxiliary equipment). The OCGT units will remain in place; 2) Addition of FinFan cooler unit and associated plant; 3) Revised Water Treatment Plant (‘WTP’) design and layout, incorporating: Replacement of de-ionising building with modular demineralised water plant; Addition of air compressor container, waste water and oily water collection sumps, and chemical dosing skid; Revised...
Named firms
Public source roles
- Sse Generation (Ireland) Ltd
- Applicant / promoter on the public planning record
- Application role only; current development or appointment status is not confirmed.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Meath County Council
- Exact reference
- 2560957
- Evidence reviewed
- 2 Jun 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Infrastructure
The public application record identifies infrastructure in the submitted planning scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- Sse Generation (Ireland) Ltd
- Planning agent
- Mark McSweeney
- Agent address
- Gravis Planning 41 Baggot Street Lower Dublin 2 D02 NN67
More Meath planning activity
These are county discovery links, not claimed relationships to this application.
Application text
the proposed amendments include: 1) Removal of the gas turbine buildings housing the approved OCGT units (Turbines, generators and auxiliary equipment). The OCGT units will remain in place; 2) Addition of FinFan cooler unit and associated plant; 3) Revised Water Treatment Plant (‘WTP’) design and layout, incorporating: Replacement of de-ionising building with modular demineralised water plant; Addition of air compressor container, waste water and oily water collection sumps, and chemical dosing skid; Revised position for chemical storage area and bund; Replacement of firefighting water tank with firefighting foam tank. 4) Addition of raw water and demineralised water pumps within water storage area; 5) Reduction in height and area of Service Building, from 6m high to 3m high and from 520 sq. m. to 256 sq. m.; 6) Revised positioning of Hydrotreated Vegetable Oil (‘HVO’) storage tanks within approved fuel storage area; 7) Addition of gas Above Ground Installation (‘AGI’) and connection to gas main running to the north of the site to facilitate the use of gas as a fuel option for the approved OCGT units. Electrical output will increase from 170MW to 190MW when fuelled on gas; 8) Addition of gas filtration, heating and pressure reduction skids; 9) Change in height of 110kV transformers, from 5m to 6.8m; 10) Addition of 4 no. auxiliary transformers; 11) Modularisation of switchgear building, resulting in revised area (Increase from 160.43 sq. m. to 225.20 sq. m.); 12) Addition of emergency generator; 13) All associated ancillary development, site works and services. The application relates to a development which comprises or is for the purposes of an activity requiring an Industrial Emissions Directive (IED) licence. The application relates to the provision of an establishment to which the Chemicals Act (Control of Major Accident Hazards Involving Dangerous Substances) Regulations 2015 (S.I. 209 of 2015) apply. A Natura Impact Statement accompanies the application, which takes account of the proposed amendments and also additional minor development on the site (MV substation building and associated underground cabling) that has been applied for under a separate application
Application to site progress
-
Applied 10 Sep 2025 2560957
-
Decision Conditional 4 Nov 2025
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2560957
the proposed amendments include: 1) Removal of the gas turbine buildings housing the approved OCGT units (Turbines, generators and auxiliary equipment). The OCGT units will remain in place; 2) Addition of FinFan cooler unit and associated plant; 3) Revised Water Treatment Plant (‘WTP’) design and layout, incorporating: Replacement of de-ionising building with modular demineralised water plant; Addition of air compressor container, waste water and oily water collection sumps, and chemical dosing skid; Revised position for chemical storage area and bund; Replacement of firefighting water tank with firefighting foam tank. 4) Addition of raw water and demineralised water pumps within water storage area; 5) Reduction in height and area of Service Building, from 6m high to 3m high and from 520 sq. m. to 256 sq. m.; 6) Revised positioning of Hydrotreated Vegetable Oil (‘HVO’) storage tanks within approved fuel storage area; 7) Addition of gas Above Ground Installation (‘AGI’) and connection to gas main running to the north of the site to facilitate the use of gas as a fuel option for the approved OCGT units. Electrical output will increase from 170MW to 190MW when fuelled on gas; 8) Addition of gas filtration, heating and pressure reduction skids; 9) Change in height of 110kV transformers, from 5m to 6.8m; 10) Addition of 4 no. auxiliary transformers; 11) Modularisation of switchgear building, resulting in revised area (Increase from 160.43 sq. m. to 225.20 sq. m.); 12) Addition of emergency generator; 13) All associated ancillary development, site works and services. The application relates to a development which comprises or is for the purposes of an activity requiring an Industrial Emissions Directive (IED) licence. The application relates to the provision of an establishment to which the Chemicals Act (Control of Major Accident Hazards Involving Dangerous Substances) Regulations 2015 (S.I. 209 of 2015) apply. A Natura Impact Statement accompanies the application, which takes account of the proposed amendments and also additional minor development on the site (MV substation building and associated underground cabling) that has been applied for under a separate application