Retention, Taterstown Donaghpatrick, Navan, Co-Meath
the development will consist of: • 1) The removal of existing front boundary hedging and replacement with a fence boundary treatment. Replacing the existing red brick of the piers and wall of the entrance gate with a stone finish; • 2) Replacing the existing red brick finish with a stone finish of the external wall; • 3)...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
No near-term procurement timing is inferred from a refused planning decision.
REFUSED / Confidence: High for planning stateDecision recorded 27 Jul 2026.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
the development will consist of: • 1) The removal of existing front boundary hedging and replacement with a fence boundary treatment. Replacing the existing red brick of the piers and wall of the entrance gate with a stone finish; • 2) Replacing the existing red brick finish with a stone finish of the external wall; • 3) Retention for two existing sheds located within the rear garden used for domestic storage and an art room. Together with all associated site works
Named firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Meath County Council
- Exact reference
- 2660658
- Evidence reviewed
- 9 Aug 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Retention
The public application record identifies retention in the submitted planning scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- David & Elizabeth Andrew
- Architect
- Kerley Ferreira
- Planning agent
- Kerley Ferreira
- Agent address
- 153 Millbrook, Johnstown, Navan Johnstown Navan C15 Y6W2
More Meath planning activity
These are county discovery links, not claimed relationships to this application.
Application text
the development will consist of: • 1) The removal of existing front boundary hedging and replacement with a fence boundary treatment. Replacing the existing red brick of the piers and wall of the entrance gate with a stone finish; • 2) Replacing the existing red brick finish with a stone finish of the external wall; • 3) Retention for two existing sheds located within the rear garden used for domestic storage and an art room. Together with all associated site works
Application to site progress
-
Applied 2 Jun 2026 2660658
-
Decision Refused 27 Jul 2026
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed This planning record has no linked public commencement evidence.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2660658
the development will consist of: • 1) The removal of existing front boundary hedging and replacement with a fence boundary treatment. Replacing the existing red brick of the piers and wall of the entrance gate with a stone finish; • 2) Replacing the existing red brick finish with a stone finish of the external wall; • 3) Retention for two existing sheds located within the rear garden used for domestic storage and an art room. Together with all associated site works
Open official record