Planning application · Co. Monaghan
Renewable Biogas Plant and associated road improvements, Drum, Co. Monaghan
Decision to grant 29 Oct 2026, open to appeal until 25 Nov 2026
Key facts
- Planning application 2660018 at Drum, Co. Monaghan: Renewable Biogas Plant and associated road improvements.
- The applicant is Stream Bioenergy Ireland Ltd. The agent is Rachel Condon.
- It was received by Monaghan County Council on 28 Jan 2026.
- Status: Decision to grant 29 Oct 2026, open to appeal until 25 Nov 2026.
- The council decided on 29 Oct 2026 to grant permission. The decision is open to appeal until 25 Nov 2026; the final grant issues after that if there is no appeal, and building work cannot start before it. No site start has been filed yet.
Source: the Monaghan County Council planning register, checked 19 Nov 2026. Open the council's file
More planning applications in Drum · Planning applications in Co. Monaghan
What and where
Renewable Biogas Plant and associated road improvements
permission for the proposed development consisting of: i. A 10-year permission for a Renewable Biogas Plant and associated road improvements, on a site of approximately 6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion technology. The development will consist of: (a) Buildings and associated Structures: Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building (9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx. 4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no. Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank (approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h); a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2 Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks (approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern site boundary, connecting to the L2280, designed to provide safe and efficient access for all vehicle types. (f) Local road improvement works to the L2280, (continued on site notice)
- Location
- Drum, Co. Monaghan Map
- Council
- Monaghan County Council
- Planning reference
- 2660018
- Application type
- Permission
- Applicant
- Stream Bioenergy Ireland Ltd
- Agent
- Rachel Condon
Numbers and dates
- Received
- 28 Jan 2026
- Decision to grant
- 29 Oct 2026
- Appeals until
- 25 Nov 2026
Timeline
- Application received
- Further information requested
- Further information received
- Decision to grant
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file 2660018 on eplanning.ie: drawings, reports and the decision.Open the council's file
How we know this
From the Monaghan County Council planning register, checked 19 Nov 2026. We link to the council's own file so you can check the official record before you act.
Explore the area