Small residential · Co. Offaly

Townparks & Seffin, Birr, Co. Offaly

Granted 15 Apr 2025

Archived record

This application has left our current planning lists, so this page is no longer updated. We last saw it in the council's register on 11 Jun 2026. The details below are as they were then. The council's register has the current status.

What and where

58 total no. residential units

the construction of 58 total no. residential units comprising of: (A) 2no. three-bedroom two-storey semi-detached (Type H); 1no. 2-bedroom bungalow (Type L2); 10no. 1&2-bedroom terraced bungalows in three blocks (Type L3/L4); 12no. two-bedroom two-storey terraced units in two blocks (Type M); and 4no. two-bedroom two-storey terraced units (Type N) (Total 29no. dwellings) at Macregol Páirc; (B) 8no. four-bedroom two-storey detached house (Type P); 1no.two-storey detached four-bedroom house (Type A2); 14no. two-storey four-bedroom semi-detached houses (Type Q); 4no. two-storey three-bedroom dual aspect semi-detached houses (Type R/R1); 2no. two-storey three-bedroom dual aspect semi-detached houses (Type R2/R3) (total 29no. dwellings) at Corr na Meala. (C) The construction of section of new distributor road, pathways and cycle track with access to developments listed above; (D) The provision of all groundworks, service connections, site drainage, internal paths, paving, parking, public lighting, public open space; and all associated site development works to complete the development

Location
Birr, Co. Offaly Map
Planning reference
2460120
Applicant
Beech Avenue Properties Limited

Key facts

Floor area
6,438 m²
Project type
Small residential
Received
11 Apr 2024
Granted
15 Apr 2025
Site start
13 Jun 2025

Timeline

  1. Application received
  2. Granted
  3. Site start

Outlook

What happens next

Work started on site on 13 Jun 2025, according to the commencement notice. It does not say which contractors or suppliers are appointed.

Work packages named so far

  • Roads and site development worksNamed in the application description
  • Services and drainageNamed in the application description
  • GroundworksNamed in the planning documents
  • LandscapingNamed in the planning documents

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning fileThe application file 2460120 on eplanning.ie: drawings, reports and the decision.Open the council's file
  • From the planning documentsRead from Architectural Design Statement in the council's file.
    Unit mix
    2 3-bed semi-detached (Type H), 1 2-bed bungalow (Type L2), 10 1&2-bed terraced bungalows (Type L3/L4), 12 2-bed two-storey terraced (Type M), 4 2-bed two-storey terraced (Type N), 8 4-bed detached (Type P), 1 4-bed detached (Type A2), 14 4-bed semi-detached (Type Q), 4 3-bed semi-detached dual aspect (Type R/R1), 2 3-bed semi-detached dual aspect (Type R2/R3)
    Site area
    2.4 ha
    Applicant
    Beech Avenue Properties Limited
    Phasing
    Single phase completion of Macregol Páirc and Corr na Meala developments with distributor road.
    Scope
    Construction of 58 residential units, distributor road, cycle track, and associated site works on a 2.4Ha net site in Birr.
    Groundworks
    “Provision of all groundworks, service connections, site drainage, internal paths, paving, parking, public lighting, public open space”
    Landscaping
    “High quality planting along distributor road and linear park with landscaping for amenity and sustainable drainage”

How we know this

From the Offaly County Council planning register, as last seen on 11 Jun 2026. The council's own file is the official record. Facts from the planning documents were read from the documents in that file.

Site starts

Commencement notices for this permission

  1. 13 Jun 2025Work started · phase 1 · Construction of 3no. dwelling houses and associated site works, 61-63 inclusive, mcregol...
  2. 1 Sep 2025Work started · phase 2 · Construction 26 no. new houses and associated site works, nos. 1 to 26 incl. mcregol...
  3. 5 May 2026Work started · phase 3 · Construction 1 no new dwelling and associated site works, no. 54 corr na meala, seffin...

A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.

Explore the area

More planning activity near Birr

Get alerts for BirrFree. We email you when new applications appear.

Free email alerts

Get new Birr projects by email

New planning applications, decisions and site starts in Birr, Co. Offaly. We only email when something new appears.

How often

We send a confirmation link first. No alerts until you click it.

Follow this applicationMore alert options