Infrastructure, Collin's Lane (R443) Tullamore, Co. Offaly, The site is...
the construction of a new local neighbourhood centre development of approx. 2,607 m² (total GFA) in the form of 2 no. new single storey buildings (overall heights 6.2m and 7.5m) comprising: a) Unit No. 1 - A convenience retail supermarket with ancillary off licence (approx. 2,126 sq m GFA/1,430 m² NFA), entrance lobby...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 20 Nov 2024. / Confidence: LowDecision date 20 Nov 2024.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
the construction of a new local neighbourhood centre development of approx. 2,607 m² (total GFA) in the form of 2 no. new single storey buildings (overall heights 6.2m and 7.5m) comprising: a) Unit No. 1 - A convenience retail supermarket with ancillary off licence (approx. 2,126 sq m GFA/1,430 m² NFA), entrance lobby, ancillary managerial office spaces, customer WC area, staff welfare facilities (approx. 210 sq m GFA), warehouse facilities including delivery areas (approx. 385 sq m GFA), a switch room...
Named firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Offaly County Council
- Exact reference
- 2460187
- Evidence reviewed
- 2 Jun 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Infrastructure
The public application record identifies infrastructure in the submitted planning scope.
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
Named source parties
- Promoter
- not included in reference feed
- Planning agent
- not included in reference feed
More Offaly planning activity
These are county discovery links, not claimed relationships to this application.
Application text
the construction of a new local neighbourhood centre development of approx. 2,607 m² (total GFA) in the form of 2 no. new single storey buildings (overall heights 6.2m and 7.5m) comprising: a) Unit No. 1 - A convenience retail supermarket with ancillary off licence (approx. 2,126 sq m GFA/1,430 m² NFA), entrance lobby, ancillary managerial office spaces, customer WC area, staff welfare facilities (approx. 210 sq m GFA), warehouse facilities including delivery areas (approx. 385 sq m GFA), a switch room (approx. 12 sq m GFA) and a plant room (approx. 14 sq m); b) Unit No. 2 - A café (approx. 240 sq m GFA) with external outdoor seating area, ancillary office and staff welfare facilities and bin store; c) Unit No. 3 - A pharmacy (approx. 110 sq m GFA) including a store area; d) Unit No. 4 - A retail unit (approx. 78 sq m GFA); e) 1 no. new link road (to the north of the development site) via the roundabout to the north west of the site, which will deliver 1 no. new vehicular access point and new pedestrian connections to the site together with new pedestrian connections from Collins Lane (to the south of the site); f) A Deposit Return Scheme Facility (approx. 25 m² GFA); g) Service and delivery yard area to include a new dock leveller, loading bay, overhead canopy, bin store, generator, a refrigeration plant area and an EV charging point for delivery vehicles. h) Retail Signage (total approx. 74.75 m²) including 2 no. advertising totem signage structures (33 sq m) and façade retail signage associated with the overall development (approx. 41.75 sq m); i) 135 no. surface car parking spaces which includes 104 no. standard spaces, 8 no. accessible spaces, 7 no. parent and child spaces, 14 no. EV charging spaces and 2 no. click and collect spaces; j) 26 no. bicycle parking spaces including provision for 2 no. cargo bicycle spaces; k) 1 no. trolley bay shelter and 3 no. trolley return shelters; l) An ESB substation (approx. 28 m² GFA). The site development and infrastructural works provide for water, foul and surface water drainage and all associated connections; all landscaping and public lighting; all boundary treatment works; internal roads and footpaths; PV panels; and all associated site clearance, excavation and development works
Application to site progress
-
Applied 27 May 2024 2460187
-
Decision Conditional 20 Nov 2024
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2460187
the construction of a new local neighbourhood centre development of approx. 2,607 m² (total GFA) in the form of 2 no. new single storey buildings (overall heights 6.2m and 7.5m) comprising: a) Unit No. 1 - A convenience retail supermarket with ancillary off licence (approx. 2,126 sq m GFA/1,430 m² NFA), entrance lobby, ancillary managerial office spaces, customer WC area, staff welfare facilities (approx. 210 sq m GFA), warehouse facilities including delivery areas (approx. 385 sq m GFA), a switch room (approx. 12 sq m GFA) and a plant room (approx. 14 sq m); b) Unit No. 2 - A café (approx. 240 sq m GFA) with external outdoor seating area, ancillary office and staff welfare facilities and bin store; c) Unit No. 3 - A pharmacy (approx. 110 sq m GFA) including a store area; d) Unit No. 4 - A retail unit (approx. 78 sq m GFA); e) 1 no. new link road (to the north of the development site) via the roundabout to the north west of the site, which will deliver 1 no. new vehicular access point and new pedestrian connections to the site together with new pedestrian connections from Collins Lane (to the south of the site); f) A Deposit Return Scheme Facility (approx. 25 m² GFA); g) Service and delivery yard area to include a new dock leveller, loading bay, overhead canopy, bin store, generator, a refrigeration plant area and an EV charging point for delivery vehicles. h) Retail Signage (total approx. 74.75 m²) including 2 no. advertising totem signage structures (33 sq m) and façade retail signage associated with the overall development (approx. 41.75 sq m); i) 135 no. surface car parking spaces which includes 104 no. standard spaces, 8 no. accessible spaces, 7 no. parent and child spaces, 14 no. EV charging spaces and 2 no. click and collect spaces; j) 26 no. bicycle parking spaces including provision for 2 no. cargo bicycle spaces; k) 1 no. trolley bay shelter and 3 no. trolley return shelters; l) An ESB substation (approx. 28 m² GFA). The site development and infrastructural works provide for water, foul and surface water drainage and all associated connections; all landscaping and public lighting; all boundary treatment works; internal roads and footpaths; PV panels; and all associated site clearance, excavation and development works
Open official record