Demolition, Former West Offaly Power (WOP) Station, in the townland of...
The proposed development of area 7.34 ha, will consist of a battery energy storage system (BESS) located within a fenced compound and will (subject to detailed design, commercial and technical considerations) comprise of: Demolition of 4 no. prefabricated structures (c. 876 sq.m total); Up to 768 no. battery energy storage...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 6 Nov 2024. / Confidence: LowDecision date 6 Nov 2024.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
The proposed development of area 7.34 ha, will consist of a battery energy storage system (BESS) located within a fenced compound and will (subject to detailed design, commercial and technical considerations) comprise of: Demolition of 4 no. prefabricated structures (c. 876 sq.m total); Up to 768 no. battery energy storage enclosures, organised in approx. 36 no. bays. Each battery enclosure will incorporate battery packs as well as power electronics, battery management systems, cooling units and fire suppression...
Named firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Offaly County Council
- Exact reference
- 2460356
- Evidence reviewed
- 2 Jun 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Demolition
The public application record identifies demolition in the submitted planning scope.
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
Named source parties
- Promoter
- not included in reference feed
- Planning agent
- not included in reference feed
More Offaly planning activity
These are county discovery links, not claimed relationships to this application.
Application text
The proposed development of area 7.34 ha, will consist of a battery energy storage system (BESS) located within a fenced compound and will (subject to detailed design, commercial and technical considerations) comprise of: Demolition of 4 no. prefabricated structures (c. 876 sq.m total); Up to 768 no. battery energy storage enclosures, organised in approx. 36 no. bays. Each battery enclosure will incorporate battery packs as well as power electronics, battery management systems, cooling units and fire suppression systems. The battery bays will be 5m wide x 3m high and vary in length from 23.8m to 33.7m; 11 no. Medium Voltage (MV) Skids (c. 6m x 10.2m x 2.5m); Control Building (c. 285.3 sq.m); Ancillary plant and equipment comprising of: an emergency diesel generator plinth (c. 28.7 sq.m); two spare parts containers (c. 29.7 sq.m); a fire fighting water tank and pump house (c. c. 62 sq.m); an underground oil separator and collection pit; customer transformer compound including a bunded main step-up transformer (c. 141 sq.m) and firewalls, and High Voltage (HV) switchgear, linking with an underground cable; and auxiliary transformers (c. 4m x 4m x 3m); Operation and Maintenance site office including welfare facilities (c. 27.9 sq.m); All services connections including electrical, water and wastewater and connections to existing surface water drains; 2 no. lightning monopoles (c. 18m high); A c. 135m long, c. 5m tall concrete retaining wall to the east of the site; and All other ancillary site clearance and development works including provision of biodiversity landscaping; areas of hardstanding; internal access roads; lighting; laydown area; fencing and access gates (c. 4m in height); car parking; and connections to site services networks. Planning permission is being sought for a duration of 10-years. WOP Station is licenced by the Environmental Protection Agency under an industrial emissions (IE) licence [Ref. P0611-02]. A Natura Impact Statement (NIS) is submitted with the planning application.
Application to site progress
-
Applied 12 Sep 2024 2460356
-
Decision Conditional 6 Nov 2024
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2460356
The proposed development of area 7.34 ha, will consist of a battery energy storage system (BESS) located within a fenced compound and will (subject to detailed design, commercial and technical considerations) comprise of: Demolition of 4 no. prefabricated structures (c. 876 sq.m total); Up to 768 no. battery energy storage enclosures, organised in approx. 36 no. bays. Each battery enclosure will incorporate battery packs as well as power electronics, battery management systems, cooling units and fire suppression systems. The battery bays will be 5m wide x 3m high and vary in length from 23.8m to 33.7m; 11 no. Medium Voltage (MV) Skids (c. 6m x 10.2m x 2.5m); Control Building (c. 285.3 sq.m); Ancillary plant and equipment comprising of: an emergency diesel generator plinth (c. 28.7 sq.m); two spare parts containers (c. 29.7 sq.m); a fire fighting water tank and pump house (c. c. 62 sq.m); an underground oil separator and collection pit; customer transformer compound including a bunded main step-up transformer (c. 141 sq.m) and firewalls, and High Voltage (HV) switchgear, linking with an underground cable; and auxiliary transformers (c. 4m x 4m x 3m); Operation and Maintenance site office including welfare facilities (c. 27.9 sq.m); All services connections including electrical, water and wastewater and connections to existing surface water drains; 2 no. lightning monopoles (c. 18m high); A c. 135m long, c. 5m tall concrete retaining wall to the east of the site; and All other ancillary site clearance and development works including provision of biodiversity landscaping; areas of hardstanding; internal access roads; lighting; laydown area; fencing and access gates (c. 4m in height); car parking; and connections to site services networks. Planning permission is being sought for a duration of 10-years. WOP Station is licenced by the Environmental Protection Agency under an industrial emissions (IE) licence [Ref. P0611-02]. A Natura Impact Statement (NIS) is submitted with the planning application.
Open official record