Protected structure · Co. Offaly

Dwelling at Main Street, Killeigh Village, Killeigh Co Offaly

Granted 3 Feb 2026 (final grant issued 12 Mar 2026)

Get updates on this application

We'll email you when building work starts.

We send a confirmation link first. Nothing starts until you click it. You can stop at any time.

Key facts

  • Planning application 2560476 at Dwelling At Main Street, Killeigh Village, Killeigh Co Offaly: Refurbishment of dwelling.
  • It was received by Offaly County Council on 9 Oct 2025.
  • Status: Granted 3 Feb 2026 (final grant issued 12 Mar 2026).
  • Work started on site on 8 May 2026, according to the commencement notice. It does not say which contractors or suppliers are appointed.

Source: the Offaly County Council planning register, checked 2 Jun 2026. Open the council's file

Planning applications in Co. Offaly

What and where

Refurbishment of dwelling

the refurbishment of dwelling including re-slating of roof with repairs to roof timbers and chimneys, replacement of rainwater goods. Proposed new windows, repairs to lime render including removal of sand and cement render. Proposed removal of dilapidated gable at rear and lowering of abutting lean-to wall at front, stitch repairs to cracks in structure, proposed lowering of ground levels around house, refurbishment of existing rear extension with a new roof, external insulation and relocation of a window. Proposed new opening in rear elevation for double doors and new opening in west elevation for new window. Proposed demolition of concrete out-house. To front, new low boundary wall with railings and pedestrian gate to front garden and new vehicular gates. Internally, removal of all vegetation and non-original fixtures and fittings, replacement of all rotten and damaged timbers and treatment of all timbers for fungal and insect infestation, repair to timber floors including joists, floorboards and skirtings, insulation between ground floor joists, removal of non-original coloured concrete floor slab in hall and replacement with new insulated floor slab, repair to lime plaster and breathable insulation to walls, repair to ceilings and cornices, insulation to attic floor and new attic hatch. New bathrooms and utility room in extension, new en-suite and wardrobes in master bedroom, new kitchen and joinery throughout, new plumbing and electrics throughout, new decoration including internal and external painting in breathable paint. All associated site works including services, drainage and hard and soft landscaping. This property is a Protected Structure and formerly an RIC Barracks

Description as published by the council. Its text starts part-way through a sentence.

Location
Killeigh Village, Co. Offaly Map
Planning reference
2560476

Numbers and dates

Homes
1
Floor area
206 m²
Project type
Protected structure
Received
9 Oct 2025
Decision to grant
3 Feb 2026
Final grant
12 Mar 2026
Site start
8 May 2026
Protected structure
Yes

Timeline

  1. Application received
  2. Decision to grant
  3. Final grant issued
  4. Site start

Outlook

What happens next

Work started on site on 8 May 2026, according to the commencement notice. It does not say which contractors or suppliers are appointed. View the site start

Work packages named so far

  • Conservation work to a protected structureNamed in the application description
  • Services and drainageNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning fileThe application file 2560476 on eplanning.ie: drawings, reports and the decision.Open the council's file

How we know this

From the Offaly County Council planning register, checked 2 Jun 2026. We link to the council's own file so you can check the official record before you act.

Site starts

Commencement notices for this permission

  1. 8 May 2026Work started · The refurbishment of a protected structure (dwelling) including re-slating of roof with...View the site start

A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.

Explore the area

More planning activity near Killeigh Village

Get alerts for Co. OffalyFree. We email you when new applications appear.

Free email alerts

Get new Offaly projects by email

New applications, decisions and site starts in Co. Offaly. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

Email alerts for this applicationMore alert options