New Application · decision due 28 Oct 2026Pre-decision · not yet granted

Energy, Within the townlands of, Raheenbeg Ballychristal Killarles and Bawnmore...

Raheenbeg Ballychristal Killarles And Bawnmore, Offaly · Offaly County Council · Plan 2660473 · PB ref PB-2823284904

RED III application - The development will consist of planning permission for a period of 10 years to construct and complete a solar PV energy development (renewable energy development) with a total site area of 143.4 hectares, comprising of the construction of PV panels mounted on metal frames, inverters, internal access...

Indicative value Not listed PB indicative band
Units applied for Not listed public application record
Floor area Not listed no reliable figure indexed
Decision due 28 Oct 2026 public planning date
Commenced None indexed public commencement index
Applied for, not granted

The record describes what is sought. Nothing is permitted until the authority decision.

Application scope

Package signals below are limited to wording in the public application record.

Not procurement evidence

No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.

Opportunity & supplier intelligence

What is known, and what may happen next

Source-linked

Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.

Likely procurement timing Post-decision monitoring

A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.

A decision-stage public state is indexed. / Confidence: Low
Decision N/A

A decision-stage public state is indexed.

Commencement activity No linked activity indexed

No commencement indexed / This is an index state, not proof that no works have started.

Source limited
Drawings availability Drawing availability not indexed

No drawing entry is available in this lead's bounded document evidence.

Source limited

Confirmed application scope

RED III application - The development will consist of planning permission for a period of 10 years to construct and complete a solar PV energy development (renewable energy development) with a total site area of 143.4 hectares, comprising of the construction of PV panels mounted on metal frames, inverters, internal access tracks, perimeter fencing with CCTV cameras and access gates, electrical cabling and ducting, two temporary construction compounds, landscaping and all ancillary grid infrastructure and...

Ref 2660473 Source-linked Official application description for exact planning reference 2660473

Public source roles

Raheen Beg Solar Ltd
Applicant / promoter on the public planning record
Application role only; current development or appointment status is not confirmed.

Explicit source signals only

0 packages

No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.

Confidence & provenance 0 official sources
Authority
Offaly County Council
Exact reference
2660473
Evidence reviewed
26 Sep 2026
Confidence
Source-linked

Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.

Application-stage scope

What the public record evidences

1 source-supported signals
Energy

Energy

The public application record identifies energy in the submitted planning scope.

2660473Explicit application record

Only source-supported scope signals are shown; generic trade padding is omitted.

Project facts

Named source parties

Promoter
Raheen Beg Solar Ltd
Planning agent
Keeva Hubberstey
Agent address
83-85 Bridge Street Ballymena Co. Antrim
Official description

Application text

RED III application - The development will consist of planning permission for a period of 10 years to construct and complete a solar PV energy development (renewable energy development) with a total site area of 143.4 hectares, comprising of the construction of PV panels mounted on metal frames, inverters, internal access tracks, perimeter fencing with CCTV cameras and access gates, electrical cabling and ducting, two temporary construction compounds, landscaping and all ancillary grid infrastructure and associated works. The proposed development will utilise two existing access points, which will include the upgrading and widening of an existing access off the L1013. The solar farm would be operational for 40 years. A Natura Impact Statement (NIS) has been prepared in respect of this application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply

Source-aware chronology

Application to site progress

Empty lanes explain their state.
AppealsAn Coimisiún Pleanála
  1. Appeal No appeal possible yet The application has not been decided.
CommencementPublic commencement index
  1. Commenced No commencement indexed A scheme cannot start before it is permitted.
CompletionPublic completion projection
  1. Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Evidence register

Source, scope and limits

Public planning record
Application description and scale 2660473

RED III application - The development will consist of planning permission for a period of 10 years to construct and complete a solar PV energy development (renewable energy development) with a total site area of 143.4 hectares, comprising of the construction of PV panels mounted on metal frames, inverters, internal access tracks, perimeter fencing with CCTV cameras and access gates, electrical cabling and ducting, two temporary construction compounds, landscaping and all ancillary grid infrastructure and associated works. The proposed development will utilise two existing access points, which will include the upgrading and widening of an existing access off the L1013. The solar farm would be operational for 40 years. A Natura Impact Statement (NIS) has been prepared in respect of this application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply

AuthorityOffaly County Council
Reference2660473
StatusChecked 26 Sep 2026
Open official record