Save this project to account

Agricultural · Co. Offaly

Derryarkin, Rhode, Co. Offaly, R35 X397

Decision due 23 Nov 2026

What and where

Demolition of existing agricultural sheds and structures on-site and…

the demolition of existing agricultural sheds and structures on-site and the construction and operation of a Materials Recovery Facility (MRF) for the acceptance and processing of up to 90,000 tonnes per annum of household, commercial and industrial (C&I), and construction and demolition (C&D) waste. Elements of the proposed development include the following. (1) The demolition of all existing agricultural sheds and structures on-site (which cover an area of 1,417 m²). (2) The construction and operation of a Materials Recovery Facility, comprising: (a) a site entrance; (b) a weighbridge; (c) truck set down and parking areas; (d) staff parking, comprising 24 parking spaces including disabled parking and electric vehicle (EV) charging; (e) a concrete yard area; (f) a fuel storage area, consisting of a diesel tank and a raised bund wall; (g) external waste storage bays; (h) skip/bin storage areas; (i) a perimeter boundary wall (4 m in height) and perimeter fencing (2.1 m in height), with a hawthorn hedgerow maintained at a height of 4.5 to 5 m and width of 1.5 to 2 m along the southern perimeter of the site; (j) an overground firewater storage tank (5.5 m in diameter and 3.8 m in height, with a maximum capacity of 78 m³); (k) a two-storey Administration Building (7.35 m in height, with an overall floor area of 396 m²); (l) a single storey MRF building (13 m in height, with an overall floor area of ca. 2,850 m² to a maximum height of 13 m), which will include waste storage and processing areas and a separate workshop area; (m) a below grade truck loading bay situated within the MRF building; (n) an on-site ESB sub-station and adjoining electrical room (2.175 m in height, with a combined floor area of 61 m²); (o) solar panels (covering a total area of 737 m²) mounted atop the proposed Administration and MRF building roofs; (p) an on-site wastewater treatment system (for wastewater generated at sanitary facilities in the Administration Building), including an associated percolation area and ancillary services; (q) a dedicated drainage system for managing uncontaminated stormwater generated on roof and non-process yard areas on-site, which will include a Continuous Water Quality Monitoring System, an underground stormwater attenuation tank (436.8 m³ in size), a Class 1 By-Pass Separator, a proposed slam shut valve (which can be triggered automatically), a hydrobrake and a proposed manhole gate valve; and (r) a separate, dedicated collection system for managing contaminated stormwater generated at external waste storage bays on site and washwater generated inside the MRF building, which will include an underground contaminated stormwater/washwater collection tank (78m³ in size)

Location
Rhode, Co. Offaly Map
Planning reference
2660511
Applicant
Oxigen Environmental Unlimited Company
Agent
Richard Deeney

Key facts

Floor area
737 m²
Indicative value
€500k–1mPlanningBrief estimate
Project type
Agricultural
Received
29 Sep 2026
Decision due
23 Nov 2026

Outlook

What happens next

The council's decision is due on 23 Nov 2026. Building work can only follow a grant of permission.

Work packages named so far

  • Services and drainageNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning fileThe application file 2660511 on eplanning.ie: drawings, reports and the decision.Open the council's file

How we know this

From the Offaly County Council planning register, checked 30 Sep 2026. We link to the council's own file so you can check the official record before you act.

Explore the area

More planning activity near Rhode

Get alerts for RhodeFree. We email you when new applications appear.

Free email alerts

Get new Rhode projects by email

New planning applications, decisions and site starts in Rhode, Co. Offaly. We only email when something new appears.

How often

We send a confirmation link first. No alerts until you click it.

Follow this applicationMore alert options