Save to pipeline

Infrastructure · Co. Offaly

Ballycon, daingean, Co. Offaly, r35p7x6

Granted 30 Sep 2026

What and where

Extension of duration of permission 20593

20/593 FOR THE CONSTRUCTION OF A GREENHOUSE AND ANCILLARY BUILDINGS AS FOLLOWS: (1) THE DEMOLITION OF EXISTING DISUSED SHEDS AND TANK STRUCTURES COMPRISING OF C.800SQ. M. (2) THE REUSE OF AN EXISTING WORKSHOP OF C.417 m² FOR USES ANCILLARY TO THE ADJOINING PROPOSED GREENHOUSE. (3) THE CONSTRUCTION OF EXTENSIONS TO THE SIDES OF THE EXISTING WORKSHOP COMPRISING OF C.1036 m². (4) THE CONSTRUCTION OF A 10,500 m² GREENHOUSE, ATTACHED TO THE REAR OF THE EXISTING WORKSHOP. (5) THE INSTALLATION OF A PROPRIETARY EFFLUENT TREATMENT SYSTEM AND PERCOLATION BED. (6) ALL ANCILLARY SITE WORKS, ESB SUBSTATION, REMOVAL OF EXISTING TREES, ATTENUATION, RAINWATER HARVESTING AND FIREFIGHTING TANKS AND CONNECTION TO EXISTING SERVICES. A NATURA IMPACT STATEMENT (NIS) AND ENVRIONMENTAL IMPACT ASSESSMENT REPORT SCREENING HAVE BEEN PREPARED IN RESPECT OF THE PROPOSED DEVELOPMENT AND WILL BE INCLUDED WITH THE APPLICATION

Location
Daingean, Co. Offaly Map
Planning reference
EX26012
Application type
Extension of duration of permission 20593A request for more time to finish the work an existing permission allows. It is not a new scheme.
Applicant
Real Leaf Farm (Ireland) Ltd
Council planning fileGet alertsDownload PDF

Key facts

Floor area
10,500 m²
Project type
Infrastructure
Received
10 Aug 2026
Granted
30 Sep 2026

Timeline

  1. Application received
  2. Granted

Site history

This site's history

This application asks to extend permission 20593, granted 5 Jul 2021 (final grant issued 10 Aug 2021).

Earlier records are the planning references this application names, records at the same address, and records within 50 m of the same map point. An address or a map point can cover more than one property, so check the council's file before relying on a match.

Outlook

What happens next

Permission was granted on 30 Sep 2026 and no site start has been filed yet. The next step is a commencement notice, filed before building work begins; the start date and who will build it are not known yet.

Work packages named so far

  • Services and drainageNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning fileThe application file EX26012 on eplanning.ie: drawings, reports and the decision.Open the council's file

How we know this

From the Offaly County Council planning register, checked 4 Oct 2026. We link to the council's own file so you can check the official record before you act.

Explore the area

More planning activity near Daingean

Get alerts for DaingeanFree. We email you when new applications appear.

Free email alerts

Get new Daingean projects by email

New planning applications, decisions and site starts in Daingean, Co. Offaly. We only email when something new appears.

How often

We send a confirmation link first. No alerts until you click it.

Email alerts for this applicationMore alert options