Temporary/event · Co. Roscommon

Pollymount Bellanamullia Scramoge, Treanaceeve and Ballyhubert, County Roscommon.

Granted 20 Aug 2026

Get updates on this application

We'll email you when building work starts.

We send a confirmation link first. Nothing starts until you click it. You can stop at any time.

Key facts

  • Planning application 2560446 at Pollymount Bellanamullia Scramoge, Treanaceeve and Ballyhubert, County Roscommon.: Development.
  • The applicant is Ballyfeeny Green Energy Ltd. The agent is Rowan Engineering Consultants Ltd.
  • It was received by Roscommon County Council on 15 Sep 2025.
  • Status: Granted 20 Aug 2026.
  • Permission was granted on 20 Aug 2026 and no site start has been filed yet. The next step is a commencement notice, filed before building work begins; the start date and who will build it are not known yet.

Source: the Roscommon County Council planning register, checked 16 Sep 2026. Open the council's file

Planning applications in Co. Roscommon

What and where

Development

Permission for development consisting of: • The construction and operation of a wind farm consisting of six wind turbines; • The turbine specification is unconfirmed but will fall within the parameter range outlined by Roscommon County Council and will be one of the following three Options; - Technology Option 1: tip height of 160m, rotor diameter of 136m and hub height of 92m; or - Technology Option 2: tip height of 156m, rotor diameter of 133m and hub height of 90m; or - Technology Option 3: tip height of 159m, rotor diameter of 138m and hub height of 90m; • Construction of turbine hardstands (including crane and assembly areas) and turbine foundations; • Construction of approximately 3.9km of new permanent internal site access tracks and the upgrade of 0.5km of existing internal site access tracks; • Construction of a permanent onsite 38kV electrical substation, including one single storey substation building with welfare facilities, Lidar, diesel generator and fuel storage tank, all associated electrical plant and equipment, all associated underground cabling, rainwater harvesting and storage tank, wastewater holding tank, security fencing, gates, signage, and all ancillary structures and works; • Installation of underground electrical and communications cabling connecting the wind turbines to the proposed onsite 38kV electrical substation; • Construction of two temporary site compounds with associated site offices, welfare facilities, car parking, site fencing and lighting; • Erection of a permanent 30m high communications relay tower; • Construction access via six site entrances (SE1 – SE6) to include: - SE1 on the R371, SE2 and SE3 on the L6018, and SE4, SE5 and SE6 on the L60498; - SE1 and SE6 are temporary and will be reinstated following construction. SE1 may be re-established if required for turbine component repair or replacement. SE2 – SE5 will be retained permanently for operational access; • Tree felling to facilitate the construction and operation of the proposed development; • Installation of approximately 5.1km of permanent underground electrical cabling for the grid connection including cabling within the public road corridor, extending from the proposed onsite 38kV electrical Substation at Ballyfeeny to end at the junction of the R371 and the Sliabh Bawn Substation Road in the townland of Tooreen; • All associated site works, including site clearance, landscaping, site drainage, s

Location
Treanaceeve And Ballyhubert, Co. Roscommon Map
Planning reference
2560446
Applicant
Ballyfeeny Green Energy Ltd
Agent
Rowan Engineering Consultants Ltd

Numbers and dates

Project type
Temporary/event
Received
15 Sep 2025
Granted
20 Aug 2026

Timeline

  1. Application received
  2. Granted

Outlook

What happens next

Permission was granted on 20 Aug 2026 and no site start has been filed yet. The next step is a commencement notice, filed before building work begins; the start date and who will build it are not known yet.

Work packages named so far

  • Roads and site development worksNamed in the application description
  • Services and drainageNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning fileThe application file 2560446 on eplanning.ie: drawings, reports and the decision.Open the council's file

How we know this

From the Roscommon County Council planning register, checked 16 Sep 2026. We link to the council's own file so you can check the official record before you act.

Explore the area

More planning activity near Treanaceeve And Ballyhubert

Get alerts for Co. RoscommonFree. We email you when new applications appear.

Free email alerts

Get new Roscommon projects by email

New applications, decisions and site starts in Co. Roscommon. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

Email alerts for this applicationMore alert options