Infrastructure, Cam Quarry Curry & Cloonacaltry Townlands, Brideswell, Co. Roscommon
Permission for development consisting of: 1. Permission for continued use of the existing quarry development currently permitted by P. Ref. 04/1479 and ABP PL20.215417 for a further period of 25 years, within an application area of c. 66.3 hectares, with an extraction area of c. 17.1 hectares and permanent overburden storage...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
No near-term procurement timing is inferred from a refused planning decision.
REFUSED / Confidence: High for planning stateDecision recorded 17 Aug 2026.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
Permission for development consisting of: 1. Permission for continued use of the existing quarry development currently permitted by P. Ref. 04/1479 and ABP PL20.215417 for a further period of 25 years, within an application area of c. 66.3 hectares, with an extraction area of c. 17.1 hectares and permanent overburden storage area of c. 3.9 hectares; 2. Permission for continued use of the permitted facilities consisting of: ESB substation (26m²), portacabin office facilities including canteen and washroom...
Named firms
Public source roles
- Roadstone Ltd
- Applicant / promoter on the public planning record
- Application role only; current development or appointment status is not confirmed.
- Srl Consulting Ltd
- Planning agent named on the public planning record
- Submission role only; current appointment status is not confirmed.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Roscommon County Council
- Exact reference
- 2560577
- Evidence reviewed
- 31 Aug 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Infrastructure
The public application record identifies infrastructure in the submitted planning scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- Roadstone Ltd
- Planning agent
- Srl Consulting Ltd
- Agent address
- 7 Dundrum Business Park Windy Arbour Dublin 14
More Roscommon planning activity
These are county discovery links, not claimed relationships to this application.
Application text
Permission for development consisting of: 1. Permission for continued use of the existing quarry development currently permitted by P. Ref. 04/1479 and ABP PL20.215417 for a further period of 25 years, within an application area of c. 66.3 hectares, with an extraction area of c. 17.1 hectares and permanent overburden storage area of c. 3.9 hectares; 2. Permission for continued use of the permitted facilities consisting of: ESB substation (26m²), portacabin office facilities including canteen and washroom facilities (91m²), bunded fuel storage, vehicle circulation/access including wheelwash and weighbridge, settlement tanks/hydrocarbon interceptors for treatment of water, construction of overburden and screening mounds, all other associated site works and ancillary activities; 3. Permission for continued extraction of limestone using conventional blasting techniques and processing of rock using crushing and screening plant; 4. Upgrade of the existing WWTS and percolation area to new Secondary WWTS and constructed soil polishing filter area; 5. Provision of the permitted concrete block making facility and concrete batching plant, truck washdown facility with wash water recycled via a closed settlement tank system, the storage of aggregates; and workshop including storage room, canteen and washroom facilities (485m²) and 6. Restoration of the overall application site to a natural habitat including a permanent waterbody. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of this planning application at
Application to site progress
-
Applied 5 Dec 2025 2560577
-
Decision Refused 17 Aug 2026
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed This planning record has no linked public commencement evidence.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2560577
Permission for development consisting of: 1. Permission for continued use of the existing quarry development currently permitted by P. Ref. 04/1479 and ABP PL20.215417 for a further period of 25 years, within an application area of c. 66.3 hectares, with an extraction area of c. 17.1 hectares and permanent overburden storage area of c. 3.9 hectares; 2. Permission for continued use of the permitted facilities consisting of: ESB substation (26m²), portacabin office facilities including canteen and washroom facilities (91m²), bunded fuel storage, vehicle circulation/access including wheelwash and weighbridge, settlement tanks/hydrocarbon interceptors for treatment of water, construction of overburden and screening mounds, all other associated site works and ancillary activities; 3. Permission for continued extraction of limestone using conventional blasting techniques and processing of rock using crushing and screening plant; 4. Upgrade of the existing WWTS and percolation area to new Secondary WWTS and constructed soil polishing filter area; 5. Provision of the permitted concrete block making facility and concrete batching plant, truck washdown facility with wash water recycled via a closed settlement tank system, the storage of aggregates; and workshop including storage room, canteen and washroom facilities (485m²) and 6. Restoration of the overall application site to a natural habitat including a permanent waterbody. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of this planning application at
Open official record