~8 dwellings, Tesla EV Charging Hub Yeats County Inn, Curry, Co. Sligo.
High-power electric vehicle charging points and associated infrastructure consisting of the following: I. Installation of 8no. electric vehicle charging bays with 8no. Tesla illuminated charging units and associated signage, II. Installation of proposed Tesla supercharger power cabinet equipment, III. Installation of proposed...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
What the public record evidences
Small multi-unit - 8 dwellings
The public application record identifies 8 dwellings in the submitted planning scope.
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
Named source parties
- Promoter
- Tesla Motors Ireland Ltd
- Planning agent
- Ronnie McArdle
- Agent address
- McArdle Doyle Limited Second Floor Exchange Building, The Long Walk, Dundalk, Co. Louth A91 T880
Application text
High-power electric vehicle charging points and associated infrastructure consisting of the following: I. Installation of 8no. electric vehicle charging bays with 8no. Tesla illuminated charging units and associated signage, II. Installation of proposed Tesla supercharger power cabinet equipment, III. Installation of proposed modular substation, IV. Erection of associated EV signage, V. Re-location of an existing lighting pole, VI. All associated site development works including surfacing, lighting & line marking.
Application to site progress
-
Applied 1 Dec 2025 2560498
-
Decision Conditional 29 May 2026
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded Smaller works often do not require a completion certificate.
Source, scope and limits
Application description and scale 2560498
High-power electric vehicle charging points and associated infrastructure consisting of the following: I. Installation of 8no. electric vehicle charging bays with 8no. Tesla illuminated charging units and associated signage, II. Installation of proposed Tesla supercharger power cabinet equipment, III. Installation of proposed modular substation, IV. Erection of associated EV signage, V. Re-location of an existing lighting pole, VI. All associated site development works including surfacing, lighting & line marking.
Open official record