~1 dwelling, Tallyho Lodge, Cregg Rosses Point, Co. Sligo
the demolition of an existing two-storey rear extension and the construction of a replacement two-storey rear extension with flat roof, together with internal alterations and renovations to the existing dwelling. The development will also include the installation of a heat pump heating system and associated ventilation system...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
What the public record evidences
One-off house - 1 dwellings
The public application record identifies 1 dwellings in the submitted planning scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
Named source parties
- Promoter
- Kevin McCann
- Architect
- Ivor Hession
- Planning agent
- Ivor Hession
- Agent address
- tóg architecture 42 orby drive Belfast
Application text
the demolition of an existing two-storey rear extension and the construction of a replacement two-storey rear extension with flat roof, together with internal alterations and renovations to the existing dwelling. The development will also include the installation of a heat pump heating system and associated ventilation system, connection to the existing wastewater system, and all associated ancillary site works and landscaping works
Application to site progress
-
Applied 24 Feb 2026 2660070
-
Decision Conditional 14 Apr 2026
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded Smaller works often do not require a completion certificate.
Source, scope and limits
Application description and scale 2660070
the demolition of an existing two-storey rear extension and the construction of a replacement two-storey rear extension with flat roof, together with internal alterations and renovations to the existing dwelling. The development will also include the installation of a heat pump heating system and associated ventilation system, connection to the existing wastewater system, and all associated ancillary site works and landscaping works
Open official record