Development Description
The development consists of the construction of a two-storey dwelling house (H-6,400 m (OD-16,800 m )), a proprietary effluent treatment system, and all associated site works, including the use of the existing site entrance.
Sligo County Council / 2660198
The development consists of the construction of a two-storey dwelling house (H-6,400 m (OD-16,800 m )), a proprietary effluent treatment system, and...
Record 2660198. Direct source URL supplied by the public planning feed. Use the authority file for final verification before acting.
The development consists of the construction of a two-storey dwelling house (H-6,400 m (OD-16,800 m )), a proprietary effluent treatment system, and all associated site works, including the use of the existing site entrance.
Project lifecycle links
Lifecycle matches are best-effort and source-linked. Tender matches are shown only where the buyer or location match is conservative; verify before acting.
Construction of a house and all associated site works.
Construction of a house with all associated works.
Contextual resources
Same county
the demolition of an existing two-storey rear extension and the construction of a replacement two-storey rear extension with flat roof, together with internal alterations and renovations to the existing dwelling. The development will also include the instal...
Source: Sligo County Council public planning register / official file linked
(1) demolition of front single storey domestic garage block and entrance porch, (2) erection of single storey domestic extension to front in lieu of garage block, (3) rear single storey domestic extension and covered external patio, (4) external and interna...
Source: Sligo County Council public planning register / official file linked
The development will comprise of amendments to previously approved Sligo County Council planning reference no. 19/310 and An Bord Pleanála planning reference no ABP-306340-20. The proposed amendments include: A) Amendment of red line boundary. B) Redesign o...
Source: Owner-supplied commencement export / official file linked
1) Construct a terrace consisting of 8no. 2 storey 3 bedroom houses. 2) Construct roadway, on-site parking, footpaths, together with all other ancillary site works. 3) Install a storm water attenuation tank and connect to existing services.
Source: Owner-supplied commencement export / official file linked
for development consisting of the construction of a total twenty-two new holiday homes comprising eight detached, four semi-detached, and two blocks of three houses to complete the existing holiday home development which was previously granted planning perm...
Source: Owner-supplied commencement export / official file linked