Save this project to account

Infrastructure · Co. Sligo

Bord na Móna Powergen Ltd, Co. Sligo

Archived record: last seen in the register on 30 Jul 2026

Archived record

This application has left our current planning lists, so this page is no longer updated. We last saw it in the council's register on 30 Jul 2026. The details below are as they were then. The council's register has the current status.

What and where

Bord na Móna Powergen Ltd

Bord na Móna Powergen Ltd., intend to apply for permission for proposed minor temporary and permanent works to facilitate the delivery of turbine components to the permitted Oweninny Wind Farm Phase 3 (Ref. PA16.316178). The Turbine Delivery Route (TDR) will originate at the port of entry at Killybegs Harbour, Co. Donegal, runs through Co. Sligo, Co. Leitrim and terminate at the consented Oweninny Wind Farm Phase 3 site, Co. Mayo. The total length of the TDR is c.188km of which c.65km is within Co. Donegal, c.57km in Co. Sligo, and c.36km in Co. Mayo. Minor temporary and permanent works are not proposed along this entire route but only at select locations. The total area of the works proposed in Co. Sligo is 0.49 Hectares (Ha). The proposed development within the Sligo County bounds comprises both temporary and permanent works located in the townlands of Carrownacreevy, Tanrego West, Abbeytown, Corhawnagh and Carricknagat. The works are required to accommodate delivery of Abnormal Indivisible Loads (AIL) and will consist of: • Laying of temporary load bearing surfaces at 1No. location. • Temporary removal of one traffic signal, three road signs, one bollard, one pole, a bridge railing, pedestrian guardrail and wall.at 1 No. location • Temporary removal of a wall, fence, poles and vegetation at 1No. location. • Construction of a permanent slip road linking the N4 and R290 at Carricknagat. • Removal of rock outcrop at Carricknagat including trees and vegetation clearance. Laying of a load bearing surface including associated drainage and reinstatement works. • Installation of temporary construction compound at Carricknagat to include site offices, welfare facilities and car parking. • Reinstatement of all temporary works areas to previous condition. • All associated and ancillary works required for the accommodation works and construction for the TDR. Permission is sought for a period of 10 years. Separate applications will be made to both Donegal and Mayo County Councils in respect of works required at locations within each county bounds. Minor, temporary works in Donegal are proposed at Killybegs, Glebe, Aghayeevoge, Cashelreagh Glebe, Bruckless, Aighan, Bruckless and Darney. Minor, temporary works in Mayo are proposed at Lecarrow, Crossmolina, Abbeytown, Knockalegan, Glebe, Gortskeddia, Ballina, Abbeyhalfquarter, Knocknalyre and Bunree. Permanent works are proposed at Crossmolina. An Appropriate Assessment Screening Report (AASR

Location
Co. Sligo Map
Planning reference
2660259
Agent
Darragh Hobbs

Key facts

Project type
Infrastructure
Received
30 Jun 2026

Outlook

What happens next

Work packages named so far

  • Roads and site development worksNamed in the application description
  • Services and drainageNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning fileThe application file 2660259 on eplanning.ie: drawings, reports and the decision.Open the council's file

How we know this

From the Sligo County Council planning register, as last seen on 30 Jul 2026. The council's own file is the official record.

Explore the area

More planning activity near Co. Sligo

Get alerts for Co. SligoFree. We email you when new applications appear.

Free email alerts

Get new Sligo projects by email

New planning applications, decisions and site starts in Co. Sligo. We only email when something new appears.

How often

We send a confirmation link first. No alerts until you click it.

Follow this applicationMore alert options