Back to leads
New Application

Infrastructure, Carrownacreevy Tanrego West Abbeytown Corhawnagh and... - Planning Application 2660259

Sligo / Carrownacreevy Tanrego West Abbeytown Corhawnagh and Carricknagat / Carrownacreevy Tanrego West Abbeytown Corhawnagh and Carricknagat, Carrownacreevy Tanrego West Abbeytown Corhawnagh and Carricknagat, Co. Sligo

Est. value Not listed
Units Not listed
Floor area Not listed
Received 30 Jun 2026

Source-linked planning record

Infrastructure, Carrownacreevy Tanrego West Abbeytown Corhawnagh and... - Planning Application 2660259

Sligo / Carrownacreevy Tanrego West Abbeytown Corhawnagh and Carricknagat / Carrownacreevy Tanrego West Abbeytown Corhawnagh and Carricknagat, Carrownacreevy Tanrego West Abbeytown Corhawnagh and Carricknagat, Co. Sligo
PB ref
PB--3379047281
Plan ref
2660259
Authority
Sligo County Council
Stage / date
New Application / 30 Jun 2026
Est. value band
Value not disclosed
Project class
Infrastructure
Promoter
Bord Na Móna Powergen Ltd
Architect / agent
Darragh Hobbs

Source: http://www.eplanning.ie/SligoCC/AppFileRefDetails/2660259/0

Key facts

Lead summary

Source
Sligo County Council public planning register
Planning authority
Sligo County Council
Application reference
2660259
Applicant
Bord Na Móna Powergen Ltd
Agent
Darragh Hobbs
Decision stage
New Application
Received
30 Jun 2026

Official description

Verbatim source text

Bord na Móna Powergen Ltd., intend to apply for permission for proposed minor temporary and permanent works to facilitate the delivery of turbine components to the permitted Oweninny Wind Farm Phase 3 (Ref. PA16.316178). The Turbine Delivery Route (TDR) will originate at the port of entry at Killybegs Harbour, Co. Donegal, runs through Co. Sligo, Co. Leitrim and terminate at the consented Oweninny Wind Farm Phase 3 site, Co. Mayo. The total length of the TDR is c.188km of which c.65km is within Co. Donegal, c.57km in Co. Sligo, and c.36km in Co. Mayo. Minor temporary and permanent works are not proposed along this entire route but only at select locations. The total area of the works proposed in Co. Sligo is 0.49 Hectares (Ha). The proposed development within the Sligo County bounds comprises both temporary and permanent works located in the townlands of Carrownacreevy, Tanrego West, Abbeytown, Corhawnagh and Carricknagat. The works are required to accommodate delivery of Abnormal Indivisible Loads (AIL) and will consist of: • Laying of temporary load bearing surfaces at 1No. location. • Temporary removal of one traffic signal, three road signs, one bollard, one pole, a bridge railing, pedestrian guardrail and wall.at 1 No. location • Temporary removal of a wall, fence, poles and vegetation at 1No. location. • Construction of a permanent slip road linking the N4 and R290 at Carricknagat. • Removal of rock outcrop at Carricknagat including trees and vegetation clearance. Laying of a load bearing surface including associated drainage and reinstatement works. • Installation of temporary construction compound at Carricknagat to include site offices, welfare facilities and car parking. • Reinstatement of all temporary works areas to previous condition. • All associated and ancillary works required for the accommodation works and construction for the TDR. Permission is sought for a period of 10 years. Separate applications will be made to both Donegal and Mayo County Councils in respect of works required at locations within each county bounds. Minor, temporary works in Donegal are proposed at Killybegs, Glebe, Aghayeevoge, Cashelreagh Glebe, Bruckless, Aighan, Bruckless and Darney. Minor, temporary works in Mayo are proposed at Lecarrow, Crossmolina, Abbeytown, Knockalegan, Glebe, Gortskeddia, Ballina, Abbeyhalfquarter, Knocknalyre and Bunree. Permanent works are proposed at Crossmolina. An Appropriate Assessment Screening Report (AASR

Verify against official source

Project team

Named source parties

Promoter
Bord Na Móna Powergen Ltd
Planning agent
Darragh Hobbs
Agent address
Fairgreen House Fairgreen Rd Galway H91AXK8

Lifecycle timeline

Application to site progress

  1. Applied

    30 Jun 2026 2660259
  2. Decision

    N/A
  3. Commenced

    No commencement indexed Owner-export and BCMS records are indexed only when a reliable source link exists.
  4. Completed

    Completion not recorded Smaller works often do not require a completion certificate.

Likely trades & supplier leads

Inferred from scheme type and scale

ComplianceElectricalGroundworksHealth & SafetyMain contractorMechanicalSolar/Energy