~3 dwellings, Waterford, Waterford - Planning Application 2460015

Waterford / Waterford / Waterford, Waterford

Est. value Not listed
Units 3
Floor area 208 m² (per planning documents)
Commenced 12 Mar 2025

Source-linked planning record

~3 dwellings, Waterford, Waterford - Planning Application 2460015

Waterford / Waterford / Waterford, Waterford
PB ref
PB-429367
Plan ref
2460015
Authority
Waterford City and County Council
Stage / date
Commencement / 12 Mar 2025
Est. value band
Value not disclosed
Units / floor
3 / 208 m² (per planning documents)
Project class
Small residential
Promoter
not available yet
Architect / agent
ABS Construction Ltd

Source: http://www.eplanning.ie/WaterfordCCC/AppFileRefDetails/2460015/0

Key facts

Lead summary

Source
Owner-supplied commencement export
Application reference
2460015
Applicant
not available yet
Agent
ABS Construction Ltd
Decision stage
Commencement
Commenced
12 Mar 2025
Units
3
Floor area
208 m² (per planning documents)
Builder / developer
ABS Construction Ltd

Document insights

Extracted from official planning documents

Unit mix
1 1-bedroom apartment, 3 1-bedroom studio apartment
Floor area (per planning documents)
208 m²
Site area
0.0163 ha
Phasing
single phase
Scope
Refurbishment and extension of a 4-storey residential building to provide 4 modern studio/apartment units for sheltered housing.
Roofing: Existing roof retained, new gutters to extensionWastewater: Connection to existing foul network in Bridge Street

Facts only, extracted from official planning documents. Drawings and document packs are not republished.

source: Planning Report, Waterford City and County Council planning file

Official description

Verbatim source text

for the regeneration and extension of an existing residential building. The development will include the demolition of a section of the ground floor and construction of an extension to accommodate the proposed layout, removal and replacement of internal floor structures and stairs, provision of a new entrance at the rear from the existing courtyard including the demolition of an existing external wall, and all associated site works. The development will accommodate 1no. one-bedroom apartment, and 3no. one-bedroom studio apartments

Verify against official source

Project team

Named source parties

Promoter
not available yet
Planning agent
ABS Construction Ltd
Builder / developer
ABS Construction Ltd

Lifecycle timeline

Application to site progress

  1. Applied

    12 Jan 2024 2460015
  2. Decision

    Conditional 5 Mar 2024
  3. Appeal

    No appeal indexed No public appeal record is indexed against this application.
  4. Commenced

    12 Mar 2025 Work started · Renovation and Extension to Apartments for St. Vincent de Paul & Frederic Ozanam Trust
  5. Completed

    Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.

Likely trades & supplier leads

Inferred from scheme type and scale

BuilderElectricianPlumberHealth & Safety