New Application · decision due 9 Jun 2026Decision recorded

Energy, St. Mary’s Abbey, Gencairn, Lismore

Lismore, Waterford · Waterford City and County Council · Plan 2660135 · PB ref PB-431491

installation of a 150kWp (kilowatt-peak) solar photovoltaic (PV) energy system comprising ground-mounted solar panels, together with all associated mounting structures, cabling, electrical inverters, isolators, control equipment, security fencing and ancillary works required to connect to the existing electrical infrastructure...

Indicative value Not listed PB indicative band
Units applied for Not listed public application record
Floor area Not listed no reliable figure indexed
Decision due 9 Jun 2026 public planning date
Commenced None indexed public commencement index
Decision-stage scope

The public decision state is shown, but conditions and later amendments can still change delivery scope.

Application scope

Package signals below are limited to wording in the public application record.

Not procurement evidence

No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.

Opportunity & supplier intelligence

What is known, and what may happen next

Source-linked

Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.

Likely procurement timing Post-decision monitoring

A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.

Decision date 3 Jun 2026. / Confidence: Low
Decision CONDITIONAL

Decision date 3 Jun 2026.

Commencement activity No linked activity indexed

No commencement indexed / This is an index state, not proof that no works have started.

Source limited
Drawings availability Drawing availability not indexed

No drawing entry is available in this lead's bounded document evidence.

Source limited

Confirmed application scope

installation of a 150kWp (kilowatt-peak) solar photovoltaic (PV) energy system comprising ground-mounted solar panels, together with all associated mounting structures, cabling, electrical inverters, isolators, control equipment, security fencing and ancillary works required to connect to the existing electrical infrastructure on site. The proposed system will supplement the applicant’s current energy use and the power generated will be for Self-consumption. This development is covered by the provisions of the...

Ref 2660135 Source-linked Official application description for exact planning reference 2660135

Public source roles

No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.

Explicit source signals only

0 packages

No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.

Confidence & provenance 0 official sources
Authority
Waterford City and County Council
Exact reference
2660135
Evidence reviewed
31 Jul 2026
Confidence
Source-linked

Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.

Application-stage scope

What the public record evidences

1 source-supported signals
Energy

Energy

The public application record identifies energy in the submitted planning scope.

2660135Explicit application record

Only source-supported scope signals are shown; generic trade padding is omitted.

Project facts

Named source parties

Promoter
the Cistercian Community At Glencairn
Planning agent
Paul Bourke
Agent address
c/o BCM CONSULTING ENGINEERS LTD 11 THE CRESCENT O'CONNELL STREET, LIMERICK V94V2VW
Official description

Application text

installation of a 150kWp (kilowatt-peak) solar photovoltaic (PV) energy system comprising ground-mounted solar panels, together with all associated mounting structures, cabling, electrical inverters, isolators, control equipment, security fencing and ancillary works required to connect to the existing electrical infrastructure on site. The proposed system will supplement the applicant’s current energy use and the power generated will be for Self-consumption. This development is covered by the provisions of the Renewable Energy Directive iii (Directive (EU) 2023/2413)

Source-aware chronology

Application to site progress

Empty lanes explain their state.
AppealsAn Coimisiún Pleanála
  1. Appeal No appeal indexed No public appeal record is indexed against this application.
CommencementPublic commencement index
  1. Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
CompletionPublic completion projection
  1. Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Evidence register

Source, scope and limits

Public planning record
Application description and scale 2660135

installation of a 150kWp (kilowatt-peak) solar photovoltaic (PV) energy system comprising ground-mounted solar panels, together with all associated mounting structures, cabling, electrical inverters, isolators, control equipment, security fencing and ancillary works required to connect to the existing electrical infrastructure on site. The proposed system will supplement the applicant’s current energy use and the power generated will be for Self-consumption. This development is covered by the provisions of the Renewable Energy Directive iii (Directive (EU) 2023/2413)

AuthorityWaterford City and County Council
Reference2660135
StatusChecked 31 Jul 2026
Open official record