New Application · decision due 15 Jun 2026Decision recorded

Energy, Knocknaglogh Lower/ Barranastook Upper/ Knocknamona/ Woodhouse or...

Dungarvan, Waterford · Waterford City and County Council · Plan 2660139 · PB ref PB-430410

the Development (to be called Knocknamona Windfarm 2026) will consist of the following elements: a) Windfarm of eight (8) wind turbines within an overall tip height of 159m (in the same location and with a 4m higher tip height, than the 8 No. turbines previously authorized in 2022 under reference 309412-21). The turbine rotor...

Indicative value Not listed PB indicative band
Units applied for Not listed public application record
Floor area Not listed no reliable figure indexed
Decision due 15 Jun 2026 public planning date
Commenced None indexed public commencement index
Decision-stage scope

The public decision state is shown, but conditions and later amendments can still change delivery scope.

Application scope

Package signals below are limited to wording in the public application record.

Not procurement evidence

No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.

Opportunity & supplier intelligence

What is known, and what may happen next

Source-linked

Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.

Likely procurement timing Post-decision monitoring

A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.

Decision date 11 Jun 2026. / Confidence: Low
Decision CONDITIONAL

Decision date 11 Jun 2026.

Commencement activity No linked activity indexed

No commencement indexed / This is an index state, not proof that no works have started.

Source limited
Drawings availability Drawing availability not indexed

No drawing entry is available in this lead's bounded document evidence.

Source limited

Confirmed application scope

the Development (to be called Knocknamona Windfarm 2026) will consist of the following elements: a) Windfarm of eight (8) wind turbines within an overall tip height of 159m (in the same location and with a 4m higher tip height, than the 8 No. turbines previously authorized in 2022 under reference 309412-21). The turbine rotor diameter size within the range 133m to 138m inclusive; turbine hub height within the range 90m to 92.5m inclusive – all within an overall tip height of 159m. b) Construction of 8 No. turbine...

Ref 2660139 Source-linked Official application description for exact planning reference 2660139

Public source roles

Knocknamona Windfarm Ltd
Applicant / promoter on the public planning record
Application role only; current development or appointment status is not confirmed.

Explicit source signals only

0 packages

No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.

Confidence & provenance 0 official sources
Authority
Waterford City and County Council
Exact reference
2660139
Evidence reviewed
31 Jul 2026
Confidence
Source-linked

Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.

Application-stage scope

What the public record evidences

3 source-supported signals
Energy

Energy

The public application record identifies energy in the submitted planning scope.

2660139Explicit application record
Site works

Roads and site-development scope

The public application description explicitly references roads and site-development scope.

2660139Explicit description signal
Services

Services / drainage scope

The public application description explicitly references services / drainage scope.

2660139Explicit description signal

Only source-supported scope signals are shown; generic trade padding is omitted.

Project facts

Named source parties

Promoter
Knocknamona Windfarm Ltd
Official description

Application text

the Development (to be called Knocknamona Windfarm 2026) will consist of the following elements: a) Windfarm of eight (8) wind turbines within an overall tip height of 159m (in the same location and with a 4m higher tip height, than the 8 No. turbines previously authorized in 2022 under reference 309412-21). The turbine rotor diameter size within the range 133m to 138m inclusive; turbine hub height within the range 90m to 92.5m inclusive – all within an overall tip height of 159m. b) Construction of 8 No. turbine foundations and adjacent hard-core crane hardstandings. There are minor changes to the alignment of some hardstandings, to those previously authorised. c) A Windfarm Substation compound including two control buildings and outdoor electrical equipment and apparatus. The windfarm substation is in the same location and is larger than previously authorised. d) Windfarm site access roads comprising widening and upgrading of 6.8km of existing forestry roads and construction of 1.2km of new access roads. The proposed site access roads involve some realignment to those previously authorised. e) One (1) 90m lattice tower mast with meteorological equipment attached, in the same location and 9m lower than previously authorised. f) Felling of 29.8ha of commercial forestry. g) Underground cabling linking the wind turbines and meteorological mast to the Windfarm Substation; and h) All ancillary, associated and facilitating works and activities including widening of an existing forestry entrance to create the main windfarm entrance at Knocknaglogh Lower; a surface water drainage system; two temporary borrow pits and a temporary site compound. i) This application is seeking a ten-year permission and a 35-year operational period from date of commissioning of the Windfarm. This development is a Windfarm Renewable Energy Directive III (RED III) Development. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413)

Source-aware chronology

Application to site progress

Empty lanes explain their state.
AppealsAn Coimisiún Pleanála
  1. Appeal No appeal indexed No public appeal record is indexed against this application.
CommencementPublic commencement index
  1. Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
CompletionPublic completion projection
  1. Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Evidence register

Source, scope and limits

Public planning record
Application description and scale 2660139

the Development (to be called Knocknamona Windfarm 2026) will consist of the following elements: a) Windfarm of eight (8) wind turbines within an overall tip height of 159m (in the same location and with a 4m higher tip height, than the 8 No. turbines previously authorized in 2022 under reference 309412-21). The turbine rotor diameter size within the range 133m to 138m inclusive; turbine hub height within the range 90m to 92.5m inclusive – all within an overall tip height of 159m. b) Construction of 8 No. turbine foundations and adjacent hard-core crane hardstandings. There are minor changes to the alignment of some hardstandings, to those previously authorised. c) A Windfarm Substation compound including two control buildings and outdoor electrical equipment and apparatus. The windfarm substation is in the same location and is larger than previously authorised. d) Windfarm site access roads comprising widening and upgrading of 6.8km of existing forestry roads and construction of 1.2km of new access roads. The proposed site access roads involve some realignment to those previously authorised. e) One (1) 90m lattice tower mast with meteorological equipment attached, in the same location and 9m lower than previously authorised. f) Felling of 29.8ha of commercial forestry. g) Underground cabling linking the wind turbines and meteorological mast to the Windfarm Substation; and h) All ancillary, associated and facilitating works and activities including widening of an existing forestry entrance to create the main windfarm entrance at Knocknaglogh Lower; a surface water drainage system; two temporary borrow pits and a temporary site compound. i) This application is seeking a ten-year permission and a 35-year operational period from date of commissioning of the Windfarm. This development is a Windfarm Renewable Energy Directive III (RED III) Development. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413)

AuthorityWaterford City and County Council
Reference2660139
StatusChecked 31 Jul 2026
Open official record