Energy, Knocknaglogh Lower/ Barranastook Upper/ Knocknamona/ Woodhouse or...
the Development (to be called Knocknamona Windfarm 2026) will consist of the following elements: a) Windfarm of eight (8) wind turbines within an overall tip height of 159m (in the same location and with a 4m higher tip height, than the 8 No. turbines previously authorized in 2022 under reference 309412-21). The turbine rotor...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 11 Jun 2026. / Confidence: LowDecision date 11 Jun 2026.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
the Development (to be called Knocknamona Windfarm 2026) will consist of the following elements: a) Windfarm of eight (8) wind turbines within an overall tip height of 159m (in the same location and with a 4m higher tip height, than the 8 No. turbines previously authorized in 2022 under reference 309412-21). The turbine rotor diameter size within the range 133m to 138m inclusive; turbine hub height within the range 90m to 92.5m inclusive – all within an overall tip height of 159m. b) Construction of 8 No. turbine...
Named firms
Public source roles
- Knocknamona Windfarm Ltd
- Applicant / promoter on the public planning record
- Application role only; current development or appointment status is not confirmed.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Waterford City and County Council
- Exact reference
- 2660139
- Evidence reviewed
- 31 Jul 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Energy
The public application record identifies energy in the submitted planning scope.
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
Named source parties
- Promoter
- Knocknamona Windfarm Ltd
More Waterford planning activity
These are county discovery links, not claimed relationships to this application.
Application text
the Development (to be called Knocknamona Windfarm 2026) will consist of the following elements: a) Windfarm of eight (8) wind turbines within an overall tip height of 159m (in the same location and with a 4m higher tip height, than the 8 No. turbines previously authorized in 2022 under reference 309412-21). The turbine rotor diameter size within the range 133m to 138m inclusive; turbine hub height within the range 90m to 92.5m inclusive – all within an overall tip height of 159m. b) Construction of 8 No. turbine foundations and adjacent hard-core crane hardstandings. There are minor changes to the alignment of some hardstandings, to those previously authorised. c) A Windfarm Substation compound including two control buildings and outdoor electrical equipment and apparatus. The windfarm substation is in the same location and is larger than previously authorised. d) Windfarm site access roads comprising widening and upgrading of 6.8km of existing forestry roads and construction of 1.2km of new access roads. The proposed site access roads involve some realignment to those previously authorised. e) One (1) 90m lattice tower mast with meteorological equipment attached, in the same location and 9m lower than previously authorised. f) Felling of 29.8ha of commercial forestry. g) Underground cabling linking the wind turbines and meteorological mast to the Windfarm Substation; and h) All ancillary, associated and facilitating works and activities including widening of an existing forestry entrance to create the main windfarm entrance at Knocknaglogh Lower; a surface water drainage system; two temporary borrow pits and a temporary site compound. i) This application is seeking a ten-year permission and a 35-year operational period from date of commissioning of the Windfarm. This development is a Windfarm Renewable Energy Directive III (RED III) Development. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413)
Application to site progress
-
Applied 9 Mar 2026 2660139
-
Decision Conditional 11 Jun 2026
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2660139
the Development (to be called Knocknamona Windfarm 2026) will consist of the following elements: a) Windfarm of eight (8) wind turbines within an overall tip height of 159m (in the same location and with a 4m higher tip height, than the 8 No. turbines previously authorized in 2022 under reference 309412-21). The turbine rotor diameter size within the range 133m to 138m inclusive; turbine hub height within the range 90m to 92.5m inclusive – all within an overall tip height of 159m. b) Construction of 8 No. turbine foundations and adjacent hard-core crane hardstandings. There are minor changes to the alignment of some hardstandings, to those previously authorised. c) A Windfarm Substation compound including two control buildings and outdoor electrical equipment and apparatus. The windfarm substation is in the same location and is larger than previously authorised. d) Windfarm site access roads comprising widening and upgrading of 6.8km of existing forestry roads and construction of 1.2km of new access roads. The proposed site access roads involve some realignment to those previously authorised. e) One (1) 90m lattice tower mast with meteorological equipment attached, in the same location and 9m lower than previously authorised. f) Felling of 29.8ha of commercial forestry. g) Underground cabling linking the wind turbines and meteorological mast to the Windfarm Substation; and h) All ancillary, associated and facilitating works and activities including widening of an existing forestry entrance to create the main windfarm entrance at Knocknaglogh Lower; a surface water drainage system; two temporary borrow pits and a temporary site compound. i) This application is seeking a ten-year permission and a 35-year operational period from date of commissioning of the Windfarm. This development is a Windfarm Renewable Energy Directive III (RED III) Development. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413)