Energy · Co. Waterford

Development, Dungarvan, Co. Waterford

Granted 11 Jun 2026

Archived record

This application has left our current planning lists, so this page is no longer updated. We last saw it in the council's register on 19 Aug 2026. The details below are as they were then. The council's register has the current status.

What and where

Development

the Development (to be called Knocknamona Windfarm 2026) will consist of the following elements: a) Windfarm of eight (8) wind turbines within an overall tip height of 159m (in the same location and with a 4m higher tip height, than the 8 No. turbines previously authorized in 2022 under reference 309412-21). The turbine rotor diameter size within the range 133m to 138m inclusive; turbine hub height within the range 90m to 92.5m inclusive – all within an overall tip height of 159m. b) Construction of 8 No. turbine foundations and adjacent hard-core crane hardstandings. There are minor changes to the alignment of some hardstandings, to those previously authorised. c) A Windfarm Substation compound including two control buildings and outdoor electrical equipment and apparatus. The windfarm substation is in the same location and is larger than previously authorised. d) Windfarm site access roads comprising widening and upgrading of 6.8km of existing forestry roads and construction of 1.2km of new access roads. The proposed site access roads involve some realignment to those previously authorised. e) One (1) 90m lattice tower mast with meteorological equipment attached, in the same location and 9m lower than previously authorised. f) Felling of 29.8ha of commercial forestry. g) Underground cabling linking the wind turbines and meteorological mast to the Windfarm Substation; and h) All ancillary, associated and facilitating works and activities including widening of an existing forestry entrance to create the main windfarm entrance at Knocknaglogh Lower; a surface water drainage system; two temporary borrow pits and a temporary site compound. i) This application is seeking a ten-year permission and a 35-year operational period from date of commissioning of the Windfarm. This development is a Windfarm Renewable Energy Directive III (RED III) Development. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413)

Location
Dungarvan, Co. Waterford Map
Planning reference
2660139
Applicant
Knocknamona Windfarm Ltd

Key facts

Project type
Energy
Received
9 Mar 2026
Granted
11 Jun 2026

Timeline

  1. Application received
  2. Granted

Outlook

What happens next

Permission was granted on 11 Jun 2026 and no site start has been filed yet. The next step is a commencement notice, filed before building work begins; the start date and who will build it are not known yet.

Work packages named so far

  • Roads and site development worksNamed in the application description
  • Services and drainageNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning fileThe application file 2660139 on eplanning.ie: drawings, reports and the decision.Open the council's file

How we know this

From the Waterford City and County Council planning register, as last seen on 19 Aug 2026. The council's own file is the official record.

Explore the area

More planning activity near Dungarvan

Get alerts for DungarvanFree. We email you when new applications appear.

Free email alerts

Get new Dungarvan projects by email

New planning applications, decisions and site starts in Dungarvan, Co. Waterford. We only email when something new appears.

How often

We send a confirmation link first. No alerts until you click it.

Follow this applicationMore alert options