Energy · Co. Waterford
Kilmoyemoge West, Kilmoyemoge East, Lahardan, Kildermody and Glenhouse, Co. Waterford
Decision due 16 Dec 2026
Key facts
- Planning application 2660701 at Kilmoyemoge West, Kilmoyemoge East, Lahardan, Kildermody and Glenhouse, Co. Waterford: Photovoltaic farm and associated ancillary development.
- The applicant is Cullenagh Solar Farm Ltd. The agent is Anna D'Arcy.
- It was received by Waterford City and County Council on 10 Sep 2026.
- Status: Decision due 16 Dec 2026.
- The council's decision is due on 16 Dec 2026. Building work can only follow a grant of permission.
Source: the Waterford City and County Council planning register, checked 19 Nov 2026. Open the council's file
What and where
Photovoltaic farm and associated ancillary development
for a 10-year planning permission for development at this site at Kilmoyemoge West, Kilmoyemoge East, Lahardan, Kildermody and Glenhouse Co. Waterford. This development will consist of the construction of a photovoltaic (‘PV’) farm and associated ancillary development on a ca. 67.3 hectare site consisting of: Solar PV panels laid out in arrays on ground-mounted frames, covering an area of ca. 201,002 m²; Solar PV panels laid out in arrays supported by ballast footing covering an area of ca. 3,825 m²; 11 No. inverter transformer units (ca. 6.1m x 2.4m); 33kV underground collector circuit and communications cabling within private lands and within the L4026/L40262 public roads, including cabling works to connect to a proposed future 110kV substation; Pole-mounted security cameras; Perimeter security fencing (2m high) and security gates; 1 No. new permanent site entrance on the L4026; Localised permanent carriageway widening at the junction of the Site entrance and the L4026; 1 No. temporary construction compound; Installation of 2 No. new box culverts across watercourses and 1 No. new box culvert across a drainage ditch; Drainage infrastructure including infiltration basins, swales and land drains, internal access tracks, landscaping and reinstatement works; and, All associated ancillary development. A 40-year operational life from the date of full commissioning of the entire solar farm is being sought for all works (other than temporary works specified above), and the subsequent decommissioning. A Natura Impact Statement will accompany the planning application. A separate planning application for the future 110kV substation and associated grid connection will be submitted to An Coimisiún Pleanála (‘ACP’) as these proposed future elements fall within the Strategic Infrastructure Development (‘SID’) consent process under Section 182A of the Planning and Development Act 2000 (as amended). This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413), and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 (as amended) shall apply.
Description as published by the council. Its text starts part-way through a sentence.
- Location
- Kildermody And Glenhouse, Co. Waterford Map
- Planning reference
- 2660701
- Application type
- Permission
- Applicant
- Cullenagh Solar Farm Ltd
- Agent
- Anna D'Arcy
Numbers and dates
- Floor area
- 163 m²per planning documents
- Project type
- Energy
- Received
- 10 Sep 2026
- Decision due
- 16 Dec 2026
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file 2660701 on eplanning.ie: drawings, reports and the decision.Open the council's file
- From the planning documentsRead from Application Form - Part A in the council's file.
- Floor area
- 163 m² (per planning documents)
- Site area
- 67.3 ha
- Applicant in the planning documents
- Cullenagh Solar Farm Limited
- Phasing
- 10-year planning permission sought; 40-year operational life from full commissioning, followed by decommissioning
- Scope
- Construction of a photovoltaic solar farm with ground-mounted panel arrays, inverter transformer units, underground cabling, security fencing and cameras, a new site entrance, box culverts, drainage infrastructure, access tracks and landscaping on a ca. 67.3 hectare site.
- Solar PV
- “Solar PV panels laid out in arrays on ground-mounted frames”
How we know this
From the Waterford City and County Council planning register, checked 19 Nov 2026. We link to the council's own file so you can check the official record before you act. Facts from the planning documents were read from the documents in that file.