Site start · Co. Westmeath
KILTOTAN, Westmeath
Granted 23 Apr 2024 (final grant issued 31 May 2024)
Key facts
- Site start record 2460053 at Kiltotan, Co. Westmeath: Alterations to the development consented under Westmeath Planning…
- The planning authority is Westmeath County Council.
- Status: Granted 23 Apr 2024 (final grant issued 31 May 2024).
Source: the Westmeath County Council planning register, as last seen on 12 Jul 2026. Open the council's file
Council register
The council's register shows: Granted on 23 Apr 2024.
Search the Westmeath planning register
Application details as we last saw them in the national register on 12 Jul 2026.
What and where
Alterations to the development consented under Westmeath Planning…
development which will consist of alterations to the development consented under Westmeath Planning Case Ref. 21/515 (parent permission) and are as follows: (i) reconfiguration of structures and pipework within the above ground installation (AGI) compound, (ii) increase the size of gas oil (secondary fuel) storage tanks and bund and realignment of tanks within the bund, (iii) remove one consented emergency diesel generator from the development layout and reposition of the second consented emergency diesel generator alongside an LV switchroom, (iv) reposition palisade fence associated with ancillary equipment compound approximately 15m to the west, (v) reconfigure and reposition fuel pumps (polishing and forwarding), MCC equipment, fire water pump, fire water tank and air compressor adjacent to the southern side of the secondary fuel storage bund, (vi) remove water treatment module and ammonia storage tank from the development layout, (vii) remove two distribution transformers from the development layout and reposition the remaining three consented distribution transformers to the ancillary equipment compound to the west, (viii) remove five gas turbine selective catalytic reduction (SCR) units and associated ancillary components (fans), (ix) reposition of two high voltage (HV) transformers within the HV transformer compound and installation of a third HV transformer in lieu of the HV transformer consented under Planning Permission Ref. 21/532, and (x) associated minor changes to internal roads, civil engineering, drainage, landscaping, lighting, car parking, and site works. The development alterations relate to Westmeath Planning Case Ref. 21/515, which is a development that is for an activity requiring an Industrial Emissions Licence from the Environmental Protection Agency (EPA)
- Location
- Kiltotan, Co. Westmeath Map
- Council
- Westmeath County Council
- Planning reference
- 2460053
- Application type
- Commencement Notice
- Agent named on the notice
- Murphy International Ltd
Numbers and dates
- Project type
- Commercial fit-out
- Received
- 28 Feb 2024
- Decision to grant
- 23 Apr 2024
- Final grant
- 31 May 2024
- Site start notified
- 8 Jul 2024
Site history
This site's history
-
Earlier permission 21515 for this site: granted 21 Mar 2022.
The development comprises 275MWe reserve gas-fired generator to boost and back up the power system and will include the following elements… Named in this application's description
Earlier records are the planning references this application names, records at the same address, and records within 50 m of the same map point. An address or a map point can cover more than one property, so check the council's file before relying on a match.
Documents and evidence
Check the record
- Council planning fileThe application file 2460053 on eplanning.ie: drawings, reports and the decision.Open the council's file
How we know this
From the Westmeath County Council planning register, as last seen on 12 Jul 2026. The council's own file is the official record.
Site starts
Commencement notices for this permission
- 8 Jul 2024Notice filed · phase 1 · Construction of a single storey LV building and all ancillary site worksView the site start
- 8 Jul 2024Notice filed · phase 2 · Construction of a single storey Balance of Plant (BOP) building and all ancillary site...View the site start
- 12 Aug 2024Notice filed · phase 3 · Development of a new AGI (Above Ground Installation) which consists of 1No. Boiler House...View the site start
- 23 Oct 2024Notice filed · phase 4 · Construction of a single storey Pumphouse building and external plinthView the site start