Commercial new build, Zone C, Mullingar Business Park, Mullingar, Co. Westmeath...
The development will consist of modifications and additions to the development previously permitted under Reg. Ref. 2560104 for which no works have commenced. The development incorporates elements previously granted permission, including: a) Change of use of the existing decommissioned oil tank storage area (43.06 m²) to the...
The record describes what is sought. Nothing is permitted until the authority decision.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
The application is pre-decision. The earliest credible supplier window is after the public decision milestone on 17 Nov 2026; no procurement timetable is published.
Decision due 17 Nov 2026 / Confidence: MediumPublic planning decision due date; the authority may update it.
Open evidenceNo commencement indexed / A scheme cannot commence under this application before permission.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
The development will consist of modifications and additions to the development previously permitted under Reg. Ref. 2560104 for which no works have commenced. The development incorporates elements previously granted permission, including: a) Change of use of the existing decommissioned oil tank storage area (43.06 m²) to the northern elevation of the main building into staff facilities along with the construction of a link structure (46.55 m²) between the main building and existing decommissioned oil tank storage...
Open scope evidenceNamed firms
Public source roles
- Trend Technologies Mullingar Ltd
- Applicant / promoter on the public planning record
- Application role only; current development or appointment status is not confirmed.
Evidence-backed work packages
Explicit source signals only
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Confidence & provenance 1 official source
- Authority
- Westmeath County Council
- Exact reference
- 2660511
- Evidence reviewed
- 25 Sep 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Commercial new build
The public application record identifies commercial new build in the submitted planning scope.
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- Trend Technologies Mullingar Ltd
- Planning agent
- Sara Segedin
- Agent address
- 8 Clarinda Park North Dun Laoghaire Dublin A96XH21
More Westmeath planning activity
These are county discovery links, not claimed relationships to this application.
Application text
The development will consist of modifications and additions to the development previously permitted under Reg. Ref. 2560104 for which no works have commenced. The development incorporates elements previously granted permission, including: a) Change of use of the existing decommissioned oil tank storage area (43.06 m²) to the northern elevation of the main building into staff facilities along with the construction of a link structure (46.55 m²) between the main building and existing decommissioned oil tank storage area, along with all associated elevational changes, including demolition of decommissioned chimney from oil boiler. b) The removal of existing water storage tank to the southern elevation. c) The rendering of the existing lower section of the elevations to match the proposed extension finishes, with new cladding to the south, west and north elevations, with remaining existing cladding painted. d) The installation of a perimeter mesh fencing with the provision of additional parking and relocated new truck only entrance from the existing estate road. In addition, the following works are proposed: e) Construction of a 901.02 m² extension to the northern elevation to allow for the expansion of the existing production area, together with the demolition/removal of the existing compressor room, storage area and a shed (245.11 m²), relocation of the existing compressor room along with all associated elevational changes. f) Enlargement of the existing plant area-chiller compound, removal of existing fence and installation of new fencing, together with the relocation of associated pipework and required technical equipment. g) Provision of two new access doors into the north extension, relocation of the internal stair access door and a minor elevational alteration to include a new door opening into the existing plant area-chiller compound. h) Construction of 8 no. additional silos to the southern elevation adjacent to the 4 no. existing silos, including all associated structural works, service connections, removal of existing fencing and installation of replacement fencing. i) All ancillary site works, and all works above and below ground to accommodate the above works.
Application to site progress
-
Applied 23 Sep 2026 2660511
-
Decision Decision not recorded yet
-
Appeal No appeal possible yet The application has not been decided.
-
Commenced No commencement indexed A scheme cannot start before it is permitted.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2660511
The development will consist of modifications and additions to the development previously permitted under Reg. Ref. 2560104 for which no works have commenced. The development incorporates elements previously granted permission, including: a) Change of use of the existing decommissioned oil tank storage area (43.06 m²) to the northern elevation of the main building into staff facilities along with the construction of a link structure (46.55 m²) between the main building and existing decommissioned oil tank storage area, along with all associated elevational changes, including demolition of decommissioned chimney from oil boiler. b) The removal of existing water storage tank to the southern elevation. c) The rendering of the existing lower section of the elevations to match the proposed extension finishes, with new cladding to the south, west and north elevations, with remaining existing cladding painted. d) The installation of a perimeter mesh fencing with the provision of additional parking and relocated new truck only entrance from the existing estate road. In addition, the following works are proposed: e) Construction of a 901.02 m² extension to the northern elevation to allow for the expansion of the existing production area, together with the demolition/removal of the existing compressor room, storage area and a shed (245.11 m²), relocation of the existing compressor room along with all associated elevational changes. f) Enlargement of the existing plant area-chiller compound, removal of existing fence and installation of new fencing, together with the relocation of associated pipework and required technical equipment. g) Provision of two new access doors into the north extension, relocation of the internal stair access door and a minor elevational alteration to include a new door opening into the existing plant area-chiller compound. h) Construction of 8 no. additional silos to the southern elevation adjacent to the 4 no. existing silos, including all associated structural works, service connections, removal of existing fencing and installation of replacement fencing. i) All ancillary site works, and all works above and below ground to accommodate the above works.
Open official record