Commercial new build, Site Located northeast of the existing Kish Business Park...
amendments to the Battery Energy Storage System (BESS) permitted on site, under WCC Reg. Ref.: 23/62 (an amendment to WCC Reg. Ref.: 20/1088, which was subsequently further amended under WCC Reg. Ref.: 24/ 88). The proposedamendments comprise the following: • The provision of a BESS compound with a total area of c. 1.2 ha...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 27 Jun 2025. / Confidence: LowDecision date 27 Jun 2025.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
amendments to the Battery Energy Storage System (BESS) permitted on site, under WCC Reg. Ref.: 23/62 (an amendment to WCC Reg. Ref.: 20/1088, which was subsequently further amended under WCC Reg. Ref.: 24/ 88). The proposedamendments comprise the following: • The provision of a BESS compound with a total area of c. 1.2 ha which will accommodate self-contained batteries and integral fire suppression equipment, climate control equipment and associated electrical components...
Named firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Wicklow County Council
- Exact reference
- 2560350
- Evidence reviewed
- 2 Jun 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Commercial new build
The public application record identifies commercial new build in the submitted planning scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- not included in reference feed
- Planning agent
- not included in reference feed
More Wicklow planning activity
These are county discovery links, not claimed relationships to this application.
Application text
amendments to the Battery Energy Storage System (BESS) permitted on site, under WCC Reg. Ref.: 23/62 (an amendment to WCC Reg. Ref.: 20/1088, which was subsequently further amended under WCC Reg. Ref.: 24/ 88). The proposedamendments comprise the following: • The provision of a BESS compound with a total area of c. 1.2 ha which will accommodate self-contained batteries and integral fire suppression equipment, climate control equipment and associated electrical components (in place of the previously permitted three-storey BESS structure and adjacent ancillary structures). • A single storey BESS Switchroom located to the south of the BESS facility with a total gross floor area (GFA) of c. 191 sq.m and total height of c. 5.3m accommodating a control room, relay room, and cable basement. • Water Services Plant and Storage equipment located to the north-east of the BESS comprising a single-storey fire pump house with a total GFA of c. 39 sq.m and total height of c. 3.1m, and 2 no. fire hydrant and water storage tanks with a total height of c. 10.3m. • All associated amendments including amendments to internal access routes, landscaping and planting, boundary treatments, the provision of an acoustic barrier to the south of the BESS compound, lighting, and all associated ancillary works. The operation of the development on site will require an EPA Industrial Emissions Directive (IE) Licence
Application to site progress
-
Applied 9 May 2025 2560350
-
Decision Conditional 27 Jun 2025
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2560350
amendments to the Battery Energy Storage System (BESS) permitted on site, under WCC Reg. Ref.: 23/62 (an amendment to WCC Reg. Ref.: 20/1088, which was subsequently further amended under WCC Reg. Ref.: 24/ 88). The proposedamendments comprise the following: • The provision of a BESS compound with a total area of c. 1.2 ha which will accommodate self-contained batteries and integral fire suppression equipment, climate control equipment and associated electrical components (in place of the previously permitted three-storey BESS structure and adjacent ancillary structures). • A single storey BESS Switchroom located to the south of the BESS facility with a total gross floor area (GFA) of c. 191 sq.m and total height of c. 5.3m accommodating a control room, relay room, and cable basement. • Water Services Plant and Storage equipment located to the north-east of the BESS comprising a single-storey fire pump house with a total GFA of c. 39 sq.m and total height of c. 3.1m, and 2 no. fire hydrant and water storage tanks with a total height of c. 10.3m. • All associated amendments including amendments to internal access routes, landscaping and planting, boundary treatments, the provision of an acoustic barrier to the south of the BESS compound, lighting, and all associated ancillary works. The operation of the development on site will require an EPA Industrial Emissions Directive (IE) Licence
Open official record