Development Description
(1) installation of a field access gate at the proposed entrance (2) construction of a concrete slab surface at the entrance, including the provision of an Eco-drain to manage surface water runoff and discharge it to an existing roadside open ditch (3) removal of existing small trees located to the north-west of the proposed field entrance, and their replacement with indigenous tree species, to be planted in a set-back position from the public road in order to maintain natural screening (4) removal of the existing hedgerows on both sides of the proposed field entrance and their replacement with indigenous hedgerows, to be planted set back from the public road tarmac, and also the creation of additional grass verges on both sides of the entrance in order to improve visibility and (5) associated site development works