Energy, In the townlands of Askakeagh Ballymanus Killaduff Roddenagh...
RED III application Level 1 - consist of a ten year planning permission to develop an electricity service, entailing the laying of approximately 23.9 kilometers of 38kV cable from the consented Ballymanus Wind Farm (Reg. Ref. 17/814) to connect the wind farm to the national grid at the existing Arklow 220kV ESB Station, County...
The record describes what is sought. Nothing is permitted until the authority decision.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
A decision-stage public state is indexed. / Confidence: LowA decision-stage public state is indexed.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
RED III application Level 1 - consist of a ten year planning permission to develop an electricity service, entailing the laying of approximately 23.9 kilometers of 38kV cable from the consented Ballymanus Wind Farm (Reg. Ref. 17/814) to connect the wind farm to the national grid at the existing Arklow 220kV ESB Station, County Wicklow, the proposed grid connection will be installed within existing private tracks and public roadway and include, provision of joint bays, draw pits, communication chambers, three...
Named firms
Public source roles
- Abo Energy Ireland Ltd
- Applicant / promoter on the public planning record
- Application role only; current development or appointment status is not confirmed.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Wicklow County Council
- Exact reference
- 2660755
- Evidence reviewed
- 7 Sep 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Energy
The public application record identifies energy in the submitted planning scope.
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- Abo Energy Ireland Ltd
More Wicklow planning activity
These are county discovery links, not claimed relationships to this application.
Application text
RED III application Level 1 - consist of a ten year planning permission to develop an electricity service, entailing the laying of approximately 23.9 kilometers of 38kV cable from the consented Ballymanus Wind Farm (Reg. Ref. 17/814) to connect the wind farm to the national grid at the existing Arklow 220kV ESB Station, County Wicklow, the proposed grid connection will be installed within existing private tracks and public roadway and include, provision of joint bays, draw pits, communication chambers, three phase electrical cables, optical fibre cables and cable sheath sectionalising chambers, water and rail crossings by (i) bridge crossings, (ii) horizontal directional drilling and iii) guided auger bore, limited ancillary forestry felling to facilitate construction and operation of the proposed development, reinstatement of land, road and track surface above the proposed cabling trench, all associated ancillary works. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared in respect of the proposed development and will be submitted with the application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU)2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act, as amended, When a notice issues in accordence with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply
Application to site progress
-
Applied 25 Aug 2026 2660755
-
Decision Decision not recorded yet
-
Appeal No appeal possible yet The application has not been decided.
-
Commenced No commencement indexed A scheme cannot start before it is permitted.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2660755
RED III application Level 1 - consist of a ten year planning permission to develop an electricity service, entailing the laying of approximately 23.9 kilometers of 38kV cable from the consented Ballymanus Wind Farm (Reg. Ref. 17/814) to connect the wind farm to the national grid at the existing Arklow 220kV ESB Station, County Wicklow, the proposed grid connection will be installed within existing private tracks and public roadway and include, provision of joint bays, draw pits, communication chambers, three phase electrical cables, optical fibre cables and cable sheath sectionalising chambers, water and rail crossings by (i) bridge crossings, (ii) horizontal directional drilling and iii) guided auger bore, limited ancillary forestry felling to facilitate construction and operation of the proposed development, reinstatement of land, road and track surface above the proposed cabling trench, all associated ancillary works. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared in respect of the proposed development and will be submitted with the application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU)2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act, as amended, When a notice issues in accordence with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply
Open official record