Save this project to account
Connected projectGranted

Commercial fit-out, Trim Castle Hotel, Castle Street, Trim Co. Meath.

Granted · Trim Castle Hotel, Castle Street, Trim Co. Meath.

Planning records1
Commencement events1
Appeals0
Completion evidence0

Qualified scale is available from the current public evidence. Planning and event-specific quantities remain separate below.

Planning lead

Current planning presentation

alterations and an extension to the third floor of the existing hotel to provide for a new spa with outdoor thermal area as follows: (i) removal of 2 no. bedrooms at 3rd floor level to provide a spa / thermal area (244 sq.m) including elevational alterations as necessary, (ii) provision of a spa reception area, 3 no. changing rooms and lockers, 1 no. guest WC, 1 no. accessible WC, a rasul (heat experience) with accompanying shower in the anti-chamber; (iii) extension of the spa / thermal facilities out to the Rooftop terrace (156 sq.m) at the same level to the east of the existing hotel to provide an outdoor thermal experience with a sauna, plant room, hydrotherapy pool, hot tubs, cold plunge pool, 2 no. showers, and 4 no. seaweed baths; and (iv) all other associated engineering works, drainage, landscaping, lighting, and ancillary works necessary to facilitate the development

Planning authority
meathcountycouncil
Lead planning reference
2560715
Application date
9 Jul 2025
Decision date
29 Aug 2025
Project type
Commercial fit-out
Value band
€250k–500k

Exact evidence

Planning records

25/60715 · Planning application

Meath County Council · CONDITIONAL · 2025-08-29

Open official record

Planning-case scale and each commencement-event quantity remain separate; notice quantities are never added into a project total.

Building control evidence

Separate commencement events

CN0139212MH · 2026-03-06

Alterations and an extension to the third floor of the existing hotel to provide for a new spa with outdoor thermal area.

338 m² · Source-stated event-specific quantity

Planning-case scale and each commencement-event quantity remain separate; notice quantities are never added into a project total.

Appeal evidence

Appeals

No appeal event is linked.

Completion evidence

Completion records

No completion evidence is linked.