Save to pipeline
Connected projectGranted

Temporary/event, Piercetown, Cradockstown and Ballymagillin Townlands, Dunboyne...

Granted · Piercetown, Cradockstown and Ballymagillin Townlands, Dunboyne Co. Meath

Planning records1
Commencement events1
Appeals0
Completion evidence0

Qualified scale is available from the current public evidence. Planning and event-specific quantities remain separate below.

Planning lead

Current planning presentation

a) Extension of existing Waste Water Neutralisation Plant to allow for increased capacity of waste water. This will include construction of bunded area to allow for installation of new tanks, including 3no treatment tanks all approximately 11.23 metres high and ranging in diameter from approximately 3.42 metres to approximately 8.54 metres, 1no stack approximately 5 metres high and approximately 0.6 metres in diameter and also including 1no electrical building sized approximately 20 square metres and approximately 4.6 metres high and items of plant and equipment, all located to the south of existing facility. b) Permission for change of use of temporary construction storage building to permanent waste recycling building, sized approximately 240 square metres and approximately 7 metres high. c) The works also include modifications to internal roads, new pipe bridge, site lighting and all associated works including temporary construction laydown area associated with the proposed development. This application consists of development on landholding for which a licence under Part IV of the Environmental Protection Agency Act 1992 (as amended by the Protection of the Environment Act, 2003) is required.

Planning authority
meathcountycouncil
Lead planning reference
2560554
Application date
30 May 2025
Decision date
23 Jul 2025
Project type
Temporary/event

Exact evidence

Planning records

2560554 · Planning application

Meath County Council · CONDITIONAL · 2025-07-23

Open official record

Planning-case scale and each commencement-event quantity remain separate; notice quantities are never added into a project total.

Building control evidence

Separate commencement events

2025-10-16

E-House Building, Waste Water Neutralisation Plant, Pipe Bridge and associated Material Alterations

26 m² · Source-stated event-specific quantity

Planning-case scale and each commencement-event quantity remain separate; notice quantities are never added into a project total.

Appeal evidence

Appeals

No appeal event is linked.

Completion evidence

Completion records

No completion evidence is linked.