Save this project to account
Connected projectGranted

1 dwelling, Park Hotel Shelbourne Street, Kenmare, Co. Kerry

Granted · Park Hotel Shelbourne Street, Kenmare, Co. Kerry

Planning units1Source-stated
Planning records1
Commencement events1
Appeals0
Completion evidence0

Qualified scale is available from the current public evidence. Planning and event-specific quantities remain separate below.

Planning lead

Current planning presentation

The proposed development comprises of amendments, modifications, extension and part change of use of the existing two storey Spa building connected to the hotel to the west of the hotel, including: (a) At ground floor level: (i) Refurbishment of the existing spa facilities and consolidation of all spa facilities into the ground floor of the existing two storey spa building; (ii) An extension to the ground floor to the west of circa 38 sq.m gross to provide for additional space to accommodate the full extent of the spa facilities at ground floor. The proposed extension at this level occurs in the location of an existing deck area to the west end of the building. (iii) New outdoor area to be west of new extension. (iv) An extension to the south of 8 sq.m, located to the west of the existing treatment room. (v) Extension to the north of 5 sq.m to provide for a widening of an existing corridor. (vi) An extension of 26 sq.m to the existing link corridor to the main hotel, to provide a widened corridor. The overall increase in floorspace at ground floor will be circa 77 sq.m gross. (b) At first floor level: (i) Provide the hotel with 6 no. additional guestrooms at first floor level through internal reconfiguration and amendment of existing space and extension of 90 sq.m through infilling of an existing south facing balcony located centrally; (ii) An extension to the west, partly above the extension at ground floor referenced above, to provide additional indoor space of 70 sq.m gross. (iii) A new first floor corridor linking to the existing hotel, above the existing single level corridor to the east of the Spa building, comprising of an extension of 77 sq.m gross. (iv) Part of the large existing lounge at first floor level, to the north of the first floor, to be converted into a yoga space. The existing gym is to be retained with some minor modifications, and a new pilates area to be created by modifying the existing deck space. (v) Extension of 26 sq.m gross (above proposed ground floor extension) to facilitate an extension to the spa facilities. The overall increase in floorspace at first floor will be circa 273.5 sq.m gross. (c) All associated and ancillary works, including lighting and landscaping. The proposed development will increase the floorspace from circa 1,044 sq.m gross to circa 1394.5 sq.m gross.

Planning authority
kerrycountycouncil
Lead planning reference
2460962
Application date
10 Dec 2024
Decision date
12 Feb 2025
Project type
Commercial fit-out
Value band
€250k–500k

Exact evidence

Planning records

24/60962 · Planning application

Kerry County Council · CONDITIONAL · 2025-02-12

1 units · Source-stated planning-record quantity

Floor area is withheld because it does not pass the residential plausibility check.

Open official record

Planning-case scale and each commencement-event quantity remain separate; notice quantities are never added into a project total.

Building control evidence

Separate commencement events

SN0013229KY · 2025-10-20

PROPOSED REFURBISHEMENT AND RENOVATION OF EXISTING SPA FACILITIES AT THE PARK HOTEL KENMARE TO CONSOLIDATE AND UPGRADE THE SPA FACILITIES AND TO PROVIDE NEW GUEST ACCOMMODATION

1827 m² · Source-stated event-specific quantity

Planning-case scale and each commencement-event quantity remain separate; notice quantities are never added into a project total.

Appeal evidence

Appeals

No appeal event is linked.

Completion evidence

Completion records

No completion evidence is linked.