Connected projectGranted

House extension, 3 The Mall, Main Street, Leixlip

Granted · 3 The Mall, Main Street, Leixlip

Planning floor area25.01 m²Stated in the planning application
Planning records1
Commencement events1
Appeals0
Completion evidence0

Qualified scale is available from the current public evidence. Planning and event-specific quantities remain separate below.

Planning lead

Current planning presentation

for Retention of completed works, namely a) removal of the first-floor structure / plaster ceilings to ground floor, and replacement of first floor structure. b) removal of existing chimney breasts. (note: none of the original surrounds had survived) c) removal of the following non original items: wall linings, ceilings, covings, skirtings, partitions architraves, floor coverings and internal doors. d) removal and replacement of existing non original stairs. e) removal of electrical, plumbing and drainage services. Permission for proposed works:- a) removal and restoration of 7 no original Georgian windows and the fitting of a front door and frame faithful to the original design on the front elevation. b) lime plastering to the front elevation. c) removal and restoration of 3 no Georgian windows to the rear at first floor (1 no is too badly damaged). d) new chimney pots and capping, and re-rendering of chimneys. e) replacement of fascia and soffit and installation of cast iron rainwater goods, to rear. f) breaking out of previously blocked up window ope and installation of new window, to ground floor sitting room. g) new fixture, fittings, finishes and services as per layout. h) Replacement of synthetic slates with natural ones. i) Reinstatement of 2 No. internal chimneys. j) other internal alterations to facilitate change of use from office use back to use as residential

Planning authority
Kildare County Council
Lead planning reference
25/60132
Application date
14 Feb 2025
Decision date
16 May 2025
Project type
House extension

Planning

Planning records

25/60132 · Planning application

Kildare County Council · Granted 16 May 2025

25.01 m² · Stated in the planning application

Open official record

Planning-case scale and each commencement-event quantity remain separate; notice quantities are never added into a project total.

Building control evidence

Separate commencement events

Commencement notice (owner-supplied) · 2026-04-02

Commencement evidence is linked; rejected quantities remain only in the sealed source artifact.

No publishable event quantity stated

Source-stated quantities are withheld because source records conflict.

Planning-case scale and each commencement-event quantity remain separate; notice quantities are never added into a project total.

Appeal evidence

Appeals

No appeal event is linked.

Completion evidence

Completion records

No completion evidence is linked.