~2 dwellings, The existing Wastewater Treatment Plant, Bulfin Road, Nenagh in...
Granted · The existing Wastewater Treatment Plant, Bulfin Road, Nenagh in the townland of Nenagh North
Qualified scale is available from the current public evidence. Planning and event-specific quantities remain separate below.
Planning lead
Current planning presentation
an upgrade the existing Nenagh Wastewater Treatment Plant from its current design Population Equivalent (PE) of 12,000 to a PE plant of 22,000. The wastewater will be treated and discharged via an upgraded outfall pipe into the Nenagh River to the immediate east of the site. The proposed development will comprise of: Proposed construction of: • Dual inlet pumping station • Storm overflow chamber complete with overflow screens • 2 No. storm tanks including storm return pumps and tank cleaning systems • Preliminary Treatment Stream comprising: • Fine Screens complete with screenings handling systems • Grit Removal system complete with fat, oil and grease removal • Grit Handling system and fat, oil and grease storage tank • Sludge Process Stream comprising: • Sludge Import Station complete with ancillary equipment • Waste Activated Sludge Buffer Tank complete with ancillary equipment • Picket Fence Thickeners complete with ancillary equipment • Thickened Sludge Tanks complete with transfer pumps • Sludge Dewatering system complete with outdoor sludge skips • Polymer make-up and dosing plant • Return liquors pumping station • Sequencing Batch Reactor tanks and blowers with distribution chamber • Ferric sulphate dosing plant • Tertiary Treatment Disk Filter and wastewater pumping station • 2 No. Odour Control Units with additional passive odour units • New ESB MV substation complete with outdoor generator and bunded fuel storage tanks • New control panel kiosks • Upgrade of outfall headwall to Nenagh River • Site lighting • Flood defence walls to existing buildings and Flood Compensation Areas • Revised site entrance including layby area and palisade fencing • Flow measurement and sampling chambers Proposed repurposing of existing structures as follows: • Conversion of existing Picket Fence Thickener to a sludge import pumping station. • Conversion of existing Final Settlement Tank to a final effluent buffer tank. • Conversion of existing Final Settlement Tank to a surface water attenuation tank. • Diversion of existing Northern Catchment gravity main to proposed inlet pumping station. • Diversion of existing Southern Catchment rising main to proposed inlet pumping station. Demolition of the following: • Existing (northern and southern) oxidation ditches to be demolished and partially filled in. • Existing Return Activated Sludge lifting wheel arrangement • Existing Waste Activated System pumping station • Existing belt thicken
- Planning authority
- tipperarycountycouncil
- Lead planning reference
- 2461086
- Application date
- 12 Dec 2024
- Decision date
- 30 Jun 2025
- Project type
- Infrastructure
Exact evidence
Planning records
2461086 · Planning application
Tipperary County Council · CONDITIONAL · 2025-06-30
Open official recordPlanning-case scale and each commencement-event quantity remain separate; notice quantities are never added into a project total.
Building control evidence
Separate commencement events
2026-01-29
Electrical Building at Nenagh WWTP - Construction of a Single Storey Building to accommodate ESB Sub Station, MV Room and MCC Panel Room.
72 m² · Source-stated event-specific quantity
Planning-case scale and each commencement-event quantity remain separate; notice quantities are never added into a project total.
Appeal evidence
Appeals
No appeal event is linked.
Completion evidence
Completion records
No completion evidence is linked.