Planning lead, Sean Doolin Park, Milltown Rathconrath, Co. Westmeath
Granted · Sean Doolin Park, Milltown Rathconrath, Co. Westmeath
Qualified scale is available from the current public evidence. Planning and event-specific quantities remain separate below.
Planning lead
Current planning presentation
1. Construction of 8 number light posts 24-meter-high (achieving 500 lux) on the existing playing pitch. 2. Construction of the proposed (146.5m x 58.3m) Training playing Pitch with 8 number light posts 20-meter-high (achieving 300 lux) to the South west of the site. 3. Construction of the proposed (60m x 40m) Astro Turf Pitch with 4 number light posts 12- meter-high (achieving 300 lux) to the east of the site. 4. Construction of the proposed 25m x 9.6m Viewing Stand including a storeroom to the northwest of the site. 5. Construction of (5m high x 20m in length) Hurling wall located on the South-East side on site. 6. Construction of 3m wide walkways (360m length) to be constructed around the Proposed training and astro turf pitches 7. Proposed carpark consisting 69 No carparking spaces to be finished with tarmac finish and all associated ancillary site works
- Planning authority
- westmeathcountycouncil
- Lead planning reference
- 2560174
- Application date
- 11 Apr 2025
- Decision date
- 7 Aug 2025
- Project type
- Planning record
Exact evidence
Planning records
2560174 · Planning application
Westmeath County Council · CONDITIONAL · 2025-08-07
Open official recordPlanning-case scale and each commencement-event quantity remain separate; notice quantities are never added into a project total.
Building control evidence
Separate commencement events
2026-03-24
1. Construction of 8 number light posts 24-meter-high (achieving 500 lux) on the existing playing pitch. 2. Construction of the proposed (146.5m x 58.3m) Training playing Pitch with 8 number light posts 20-meter-high (achieving 300 lux) to the South west of the site. 3. Construction of the proposed (60m x 40m) Astro Turf Pitch with 4 number light posts 12- meter-high (achieving 300 lux) to the east of the site. 4. Construction of the proposed 25m x 9.6m Viewing Stand including a storeroom to the northwest of the site. 5. Construction of (5m high x 20m in length) Hurling wall located on the South-East side on site. 6. Construction of 3m wide walkways (360m length) to be constructed around the Proposed training and astro turf pitches 7. Proposed carpark consisting 69 No carparking spaces to be finished with tarmac finish and all associated ancillary site works
240 m² · Source-stated event-specific quantity
Planning-case scale and each commencement-event quantity remain separate; notice quantities are never added into a project total.
Appeal evidence
Appeals
No appeal event is linked.
Completion evidence
Completion records
No completion evidence is linked.